Guangzhou Kinglebon Machinery Equipment Co., Ltd
                                                                                                           
Member Supplier
31 Years
Since 1995
Menu

ACT Excavator Spare Parts Crankshaft Pulley PC200-3 6D105 144*113*39 6138-31-1480

Price Negotiable
Price: Negotiation
MOQ: 1PIECES
Delivery Time: 7-10 work days
Brand: ACT
Product Description

Excavator Parts Crankshaft Pulley PC200-3 6D105 144*113*39 6138-31-1480
 
 
  Product Details  
 

Product NameCRANKSHAFT PULLEY
Place of OriginChina
Use forPC200-3 6D105
Largest OD*mm
Overrall Height*mm
Thread Size144*113*39
OEM NO.6138-31-1480
MOQ1set
Pakcaging DetailsStandard

 
 General Introduction  
We are one of the largest professional mechanical construction enterprises in China which was established in 1990s. Our company is specializing in manufacturing and exporting the whole range of Excavator Parts, such as all kinds of Filters(Sunfield),Alternators, Starters, Water Pumps, Cylinder Blocks, Oil Coolers, Oil Separators , Stepping Motors, Pistons & Piston Rings, Liners, Ignition Switches, Camshafts, Crankshafts, Main & Con Rod Bearings, Solenoid Valves, Stopper Solenoids, Gear Pumps, Fan Blades and Thermostats which are used as replacement of many type of machines.
 
 
 Direction for use
 

Matters needing attention when change engine:

1.Check if there is any transformation of the cylinder body, bearing support and cylinder liner;

2.Check if the fuel pump and jet valve are out of the standard of supplying oil;

3.Check if the water pump and fuel oil pump are work well, if the fuel oil radiator is stucked;

4.Check if the connection rod, cylinder liner and onnection rod screw are worn;

5. Keep the clean of the oil;

6.Pay attention to the opening distance of piston rings when installing;

7.Pay attention to the oil of fuel oil, it will use thick oil in winter(-30℃ ~-20℃), and thin oil in summer;

8.The pressure must above 5 Mpa after the engine started;

9.It must change the fuel oil filter after 500 hours.
 
 Packaging & Shipping 

 
Packaging

  • Neutral Packing
  • Carton
  • Wooden Case
  • As request

Shipping
 

  • By sea:20-40 days
  • By air: 5-7 days
  • By Express
  • (DHL/FEDEX/EMS/TNT): 4-7days

 

 Product show 
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Kinglebon Machinery Equipment Co., Ltd
Location 3rd Floor, No.1, Liziyuan Road, Zhucun, Dongpu,Tianhe,Guangzhou, China
Contact Person Admin ACT

Request A Quote

Please check your email address.
Your message must be at least 20 characters.