Plunger Type Energy Saving Injection Molding Machine 200T Clamping Force
MOQ:
1
Delivery Time:
25 days
Brand:
Haijiang
Product Description
Mold installation is conducted manually with details referring to Chapter 4 and Chapter 5. Installation steps are as follows:
Step 1: Adjust daylight between movable platen and stationary one to be larger than die height and make the movable platen at the position of mold open stop.
a) Press “Motor” to start pump motor;
b) Press “Mold adj. return” button to make daylight bigger than die height.
- Press “Mold open” button to start mold to the stop position.
- Press “Ejector mold return” button to make ejector return to the stop position.
- Press “Injection return” button to make injection housing return for a certain distance;
- Press again “Motor” to shut down pump motor.
Step 2: Adjust the length and quantity to match it with the mold installed.
Step 3: Position the paired mold parts to the stationary platen with mold lifting bracket for the time being.
| Machine Dimension | 5.3m*1.4m*1.9m |
| Machine Weight | 5800 kgs |
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Ningbo haijiang machinery manufacturing co.,Ltd
Location
Next to the Baozhan road, Yinzhou District, Ningbo (Tong Industrial Zone) china
Contact Person
Michael
