Jiangsu Hongbao Group Co., Ltd.
                                                                                                           
Verified Supplier
68 Years
Since 1958
Menu

EN10305-2 Standard Cold Drawn Weld Steel Tube for Automotive Camshaft Pipe with High Precision

Price Negotiable
Price: Negotiable
MOQ: 1 ton
Delivery Time: 30-45 days
Brand: HONGBAO
Product Description
E235 EN10305-2 WT0.5 Cold Drawn Weld Steel Tube, Automotive Part Camshaft Pipe
Product Overview

Cold Drawn Weld Steel Tube EN10305-2 (DIN2393) Automotive Part Camshaft Pipe

Cold drawn weld steel tube EN10305-2, conforming to DIN2393 standards, serves as a crucial component in automotive parts, notably for camshaft pipes. Manufactured through a precise cold drawing process, it ensures high precision and consistent wall thickness. This makes it ideal for applications requiring high mechanical strength and durability, such as in the automotive industry where it plays a vital role in the engine's function and efficiency.

Manufacturing Process

Cold Drawn Weld Steel Tube is called as DOM (Drawn Over Mandrel). It is produced by drawing ERW (electric resistance welded tube). During this process the sizing (wall thickness, inside and outside diameter), as well as weld integrity and surface finish is closely controlled to produce tube of the required size and mechanical property characteristics.

Material E235, E355
OD 6-80mm
WT 0.5-10mm
Standard EN10305-2, DIN2393
Technique Cold Drawn
Chemical Compositions
Steel Number Quality Level Thickness/mm Deoxidize Method C(%)≤ Si(%)≤ Mn(%)≤ P(%)≤ S(%)≤
E235(Fe360) A ≤16 N 0.22 - - 0.050 0.050
B >16-25 - 0.17 0.40 1.40 0.045 0.045
C ≤40 - 0.20 0.40 1.40 0.045 0.045
>40 - 0.17 0.40 1.40 0.045 0.045
D ≤40 E 0.20 0.40 1.40 0.040 0.040
>40 NE 0.17 0.40 1.40 0.035 0.035
- GF 0.17 0.40 1.40 0.035 0.035
E355(Fe510) C ≤30 NE 0.20 0.55 1.60 0.040 0.040
>30 NE 0.22 0.55 1.60 0.040 0.040
D ≤30 GF 0.20 0.55 1.60 0.035 0.035
>30 GF 0.22 0.55 1.60 0.035 0.035
Delivery Conditions
  • +C: No heat treatment after the final cold drawing process
  • +LC: After the final heat treatment there is a suitable drawing pass
  • +SR: After the final cold drawing process there is a stress relieve heat treatment in a controlled atmosphere
  • +A: After the final cold drawing process the tubes are annealed in a controlled atmosphere
  • +N: After the final cold drawing operation the tubes are normalized in a controlled atmosphere
Advantages (Compared with Seamless Cold Drawn Tube)
  • Better shape
  • Improved quality surface
  • Tight eccentricity and wall thickness tolerances
  • Tube more safety
  • Good toughness at low temperature
  • USA Market: 90% of the cylinder in the USA market are produced with welded tubes
  • Cost fix lengths more cheaper
Production Capacity
NO. Welding Typical Specification Unit Speed (m/min) Working Time (Hour) Capacity (Ton) Ratio of Total Output
1 Φ34×6 18 1211 11200 56%
2 Φ28×5.2 20 1522 - -
3 Φ38×4.5 28 883 5500 27.5%
4 Φ50.8×2.3 60 114 1130 5.6%
5 Φ55×3 50 190 2170 10.8%
Total - - 3920 20000 100%
Applications
  • Automotive Part
  • Hydraulic System
  • High-precision Machining
  • Others
Trade Information
  • Trade term: FON, CIF, EXW
  • MOQ: 1000KG
  • Payment: T/T; L/C
  • Sample: Free sample but postage is required
  • Delivery Time: 30-45 days
  • Packaging: Seaworthy Wooden box, customized packing
  • Others: For other detail requirements please send inquiry to us
Quality Testing

Tubes are controlled 100% by Ultrasonic test, Eddy Current Test. Also we have our own lab to control the quality of material and products.

Quality testing and inspection of cold drawn weld steel tubes

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Hongbao Group Co., Ltd.
Location DAXIN TOWN,ZHANGJIAGANG,JIANGSU P.R.CHINA
Contact Person Angela

Request A Quote

Please check your email address.
Your message must be at least 20 characters.