Kingstone Shoe-making Machinery Co. Ltd.
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Women Men Flip Flop Slipper Making Machine With Full Production Line Process

Price Negotiable
Price: negotiable
MOQ: 1SET
Delivery Time: 25-45 DAYS
Brand: Kingstone
Product Description

 

Women Men Flip Flop Manufacturing Machine with Full Production Line Process JL-108

 

 

 

One Color Flip Flop Manufacturing Machine, Full Production Line for produce flip flop, slipper, sandals, etc.

 

 

Features:

 

1. By computer, Electrical box, PLC control---more simple, fast and precision.
2. It could be equipped with air blowing system. --- can produce light weight, particularly the need for reinforced cooling effect.
3. Computerization in analysis and design---the machine is well in stability.
4. Conformed to human engineering in design---it features operational compatibility.
5. It could be equipped with servo system. --- can save 30~40% electricity.
6. It could be equipped with cooling system. --- can cooling the mould and extend the mould life.
7. The well-interconnected oil circuit by electric control --- can reduce waiting time, quicken production rate, and promote productivity.

 

 

Specifications
Machine model JL-108
Mould-clamping Unit
Work station   12,16,20,24,30
Clamping force TON 80
Opening stroke MM 210
Mould dimension MM 600*280
Height of injection nozzle MM 280
Injection Unit
Injector SET 1
Screw diameter MM 60/65/70
Screw L/D ratio L/D 20
Max.injection volume cm3 650-1000
Injection speed Cm/s 10
Screw rotation speed R.P.M 0-200
Electricity Consumption Normal Servo
Heating power of injector KW 7 7
Hydraulic unit motor KW 18.5 15.7+7.5
Total power KW 25.5 30.2
Temperature control Section 4 4
Power consumption per hour Kw/h 15-20 7-10
Dimension and Weight 24 Stations
Machine dimension (L*W*H)MM 4600*3600*2300
Machine weight KGS 6000
*Note:Above data only for reference.
 

Payment Terms

 

1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.

2. T/T, Westem Union, PayPal, Escow, MoneyGram.

 

Machine Production Time

 

25-45 days after confirm deposit.

 

Packing

 

Professional export package, plastic film packing, or Wooden case packing.

 

Shipping

 

By Sea, One Container for one machine

 

Production Process

 

Below is the process for produce full shoes, easy operate.

It need 1-3 people for the full process.

 

 

Samples:

 

 

Welcome to Kingstone Machinery!

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Kingstone Shoe-making Machinery Co. Ltd.
Location Huarui Industrial Park, Hengjiang Village, Chashan Town, Dongguan City, Guangdong Province
Contact Person Penny Peng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.