Kingstone Shoe-making Machinery Co. Ltd.
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

100-150 Pairs Per Hour Slipper Making Machine For Flip Flops Upper / Straps

Price Negotiable
Price: negotiable
MOQ: 1 SET
Delivery Time: 25-45 DAYS
Brand: Kingstone
Product Description

 

100-150 Pairs Per Hour Upper / Straps Slipper Making Machine For Flip Flops
 
 
Features:

 

1. This machine is specially used to produce 1/2/3 color PVC straps for flip flops

 

2. The multi-station mechanism is suitable for numerous molds to work in production line. It saves the time for the mold-change and extends the length of cooling time. The working efficiency is highly enhanced.

 

3. Equipped with automatic PLC system to easy the operation, even for unprofessional workers


4. Specially designed, the oil pressure circuit board is simple in structure. The function description of various switches is clearly indicated.

 

5. Servo system can be equipped to save 30-40% electricity.

 

 

 

 

Specifications
Machine model JL-138-2C JL-138-3C
Mould-clamping Unit
Work station   4/6 4/6
Clamping force TON 80 80
Opening stroke MM 210 210
Mould dimension MM 420x320 420x320
Height of injection nozzle MM 280 280
Injection Unit
Injector SET 2 3
Screw diameter MM 50,40 50,40,40
Screw L/D ratio L/D 20 20
Max.injection volume cm3 350,200 350,200,200
Injection speed Cm/s 10 10
Screw rotation speed R.P.M 0-200 0-200
Electricity Consumption
Heating power of injector KW 8/4 8/4/4
Hydraulic unit motor KW 11/7.5 11/7.5
Total electric consumption KW 30.5 34.5
Temperature control Section 3 3
Dimension and Weight
Machine dimension (L*W*H)MM 3500*2500*2900 3500*2500*2900
Machine weight KGS 6000 6500
*Note:Above data only for reference.
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Samples

 

 

Packing

Professional export package, Wooden case packing.

 

Guarantee

2 years. We provide 2 years guarantee time for all of our machine, it’s the longest time in China.

 

After-sales Service

1. We will send technicians to buyer's factory for installation and training for 5-10days;

2. Our technicians will help you to install machine and works machine;

3. After the machine works well, our technicians will teach your workers how to produce shoes, and how to solve some emergency conditions.

4. After your workers can produce shoes very skilled, then our technicians back.

5. Also you can send your technicians to our factory for training.

6. Any questions can contact us, we will reply you within 24 hours.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Kingstone Shoe-making Machinery Co. Ltd.
Location Huarui Industrial Park, Hengjiang Village, Chashan Town, Dongguan City, Guangdong Province
Contact Person Penny Peng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.