General Purpose heavy copper pcb board for heater control power
General Purpose heavy copper pcb board for heater control power
FR4 Heavy Copper Circuit Board Double Sided PCB Board Manufacturing High TG PCB
Shinelink Company is a professional PCB Fatory and manufacturer founded in 2005 year.
What we need
1. Gerber files of the bare PCB
2. Bill of materials to include: Manufacturer's part number, type of part, type of packaging, component locations listed by reference designators and quantity
3. Dimensional specifications for non-standard components
4. Assembly drawing, including any change notices
5. Final test procedures (if available)
PCB Feature
| Number of Layer | 1 - 20 Layer |
| Maximum Processing Area | 680 × 1000MM |
| Min Board Thickness | 2 Layer - 0.3MM ( 12 mil ) |
| 4 Layer - 0.4MM ( 16 mil ) | |
| 6 Layer - 0.8MM ( 32 mil ) | |
| 8 Layer - 1.0MM ( 40 mil) | |
| 10 Layer - 1.1MM ( 44 mil ) | |
| 12 Layer - 1.3MM ( 52 mil ) | |
| 14 Layer - 1.5MM ( 59 mil ) | |
| 16 Layer - 1.6MM ( 63 mil ) | |
| 18 Layer - 1.8MM ( 71 mil ) | |
| Finished Board Thickness Tolerance | Thickness ≤ 1.0MM, Tolerance: ± 0.1MM |
| 1.0MM ≤ Thickness ≤ 6.5MM, Tolerance ± 10% | |
| Twisting and Bending | ≤ 0.75%, Min: 0.5% |
| Range of TG | 130 - 215 ℃ |
| Impedance Tolerance | ± 10%, Min: ± 5% |
| Hi-Pot Test | Max: 4000V/10MA/60S |
| Surface Treatment | HASL, With Lead, HASL Free Lead |
| Flash Gold, Immersion Gold | |
| Immersion Silver, Immersion Tin | |
| Gold Finger, OSP |
Quick Leadtime
Lead time for sample
2-3 days for single-sided board
4-5 days for double-sided board
6-7 days for multilayer board
24-48 hours for urgent
Lead time or opening Mould:
3-5 days for normal mould
5-7 days for hard mould
Lead time for mass production
5-7 days for single/double sided board
7-10 days for multilayer board
PCBA capability and services SMT (Surface mounting technology), COB, DIP.
1. Material Sourcing Service
2. SMT assembly and Through hole components insertion
3. IC pre-programming / Burning on-line
4. Function testing as requested
5. Complete Unit assembly (which including plastics, metal box, Coil, cable inside etc)
6. OEM/ODM also welcomed
Packing Terms
1. Inner packing. All the goods will be packed by vacuum
2. Outer packing. Standard carton
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.