HRC56 Hardness Cold Work Die Steel Thread Core Insert with +/-0.003mm Accuracy for Plastic Injection Mold
Cylindrical Grinding Cold Work Die Steel Thread Core Insert for Injection Daily Necessary Plastic Parts is engineered for precision molding applications in the production of daily essential plastic components.
Core Insert and Outsert molding utilize the same thermoplastics, mold steel, mold structures, and injection-molding machines as conventional injection molding. In specific scenarios, vertical injection-molding machines may be employed, leveraging gravity to secure inserts during mold closure.
Core Insert molding bears similarities to overmolding by integrating different materials to enhance part properties. While slightly increasing molded part costs, this is typically balanced by eliminating manual post-molding operations. Lead time for overmolded and Core Insert molded parts is approximately 15 days—longer than standard injection molding but significantly faster than traditional Core Insert Molding methods.
Unlike overmolding's two-step process, Core Insert Molding is completed in a single operation: manual placement of threaded inserts, bushings, sleeves, or bosses into the mold, followed by mold closure, plastic injection, mold opening, and part ejection. This results in superior part strength and reliability.
Additional benefits include potential weight reduction when plastic parts with metal inserts replace all-metal components, and frequently lower overall costs compared to parts requiring assembly operations.
| Main Service | Plastic mold parts making, OEM, ODM, Non Standard available |
|---|---|
| Core & Cavity Material | S136, SKD61, Stavax, Bohler, 1.2344, 1.2372 etc |
| Mold Cavity | Single or multi-cavity |
| Standard Parts | DME, HASCO, MISUMI etc |
| Runner | Hot runner, Cold runner |
| Hot Treatment | Nitriding, Tempering |
| Surface Treatment | Polishing Tech Polish, EDM, High Gloss Polishing, Milling, Grinding, Painting, Mirror Polishing |
| Design Software | Solidworks, Catia, AUTO CAD |
| Packages | Carton Box to prevent damage during transportation |
| Certificated | ISO 9000 |
| Hardness Of The Steel | 20-60HRC |
| Lead Time | Plastic moulds: 5 weeks after mold design confirmation |
| Payment Terms | T/T Western Union Money |
- Premium quality products at competitive pricing
- Rapid delivery timelines with immediate response to inquiries
- Custom design services available
- OEM & ODM services supporting custom logos and non-standard projects
- Mixed order capability for different designs
- Factory visits welcomed
- Fast sample provision
- Over 30 patents held
- ISO 9000 certification
- Comprehensive advanced production and testing equipment
- Experienced engineering team and skilled staff for injector pins and customized mold accessories
- 100% testing prior to shipment
A: Our factory is located in Chang'an Town, Dongguan City, China. We welcome visits at any time.
A: We are a factory with over 15 years of manufacturing experience.
A: We provide continuous follow-up and await your feedback. Our experienced engineers are ready to address any issues related to our products.
A: We provide tracking numbers upon receipt from shipping agents and maintain regular updates on shipping status.
A: Yes, we can provide samples upon request.
A: Payment <= 1000USD: 100% in advance. Payment >= 1000USD: 30% T/T in advance, 70% balance before shipment.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.