High Concentricity SKS3 Die Steel Mold Core Insert with HRC58 Hardness and ±0.003mm Accuracy
High Concentricity SKS3 Die Steel Mold Core Insert Components designed for correction fluid stationery screw cap applications, offering precision engineering and reliable performance.
- Mold Core & Cavity Inserts: Designed for easy replacement of core and cavity components, ideal for small production quantities or when higher strength requirements are needed
- Shut-off & Kiss-off Inserts: Used for special hole designs requiring kiss-off or shut-off configurations during mold design
- Slider Design: Reduces machining difficulty and facilitates replacement of wear parts, suitable for applications with lower slider strength requirements
- Lifter Design: Extends mold service life by using inserts for wear-prone lifter molding parts, reducing costs and improving longevity
- Venting Design: Facilitates mold venting by adding inserts where venting is required for optimal performance
Design Principles:
- Insert design should facilitate machining processes
- Ensure proper mold venting capabilities
- Reduce costs and improve manufacturing efficiency
| Parameter | Value |
|---|---|
| Place of Origin | China |
| Brand Name | Senlan |
| Shaping Mode | Plastic Injection Mould |
| Product | Household Product |
| Model | Customized |
| Process | CNC/Milling/Grinding/WEDM/PG/EDM |
| Material | Steel, Brass, Alloy |
| Dimension | Customized Size |
| Tolerance | ±0.002mm |
| Application | Machine & Mold Component |
| MOQ | 1 Pcs |
| Surface | Natural, Polished, Coating or as customized |
| Step | Business Process | Content | Time |
|---|---|---|---|
| 1 | Receive Inquiries | Confirm customer needs | 1 Day |
| 2 | Process An Order | Confirm customer order details | - |
| 3 | Put Into Production | Order raw materials/Arrange process department | 1-3 Days |
| 4 | Quality Inspection & Control | Three-coordinate machine testing with test report | 10-30 Days |
| 5 | Product Packaging | Packaging according to customer requirements | 1-3 Days |
| 6 | Product Outbound | Shenzhen Port, Guangdong | 1-3 Days |
| 7 | Product Acceptance | - | - |
A: We are a factory with over 14 years of experience in producing plastic mold parts.
A: We specialize in manufacturing plastic mold parts and welding structural components.
A: Powder Coating, Zinc Plated, Nickel Plated, Tin Plated, Brass Plated, Silver Plated, Gold Plated, Anodizing, and more. Surface treatments are handled through specialized suppliers.
A: Yes, sample orders are available for quality checking and market testing. Simple samples are free, while OEM/ODM samples may incur costs. Freight is collect payment.
A: MOQ is 1 piece when inventory is available.
A: Plastic mold parts manufacturing cycle is 15-50 days. Standard mold parts delivery is 3-10 days after payment. For OEM or tooling projects, we confirm delivery times with customers.
A: We recommend 30% T/T deposit with balance paid before shipment.
A: Yes, we have over 14 years of OEM/ODM experience.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.