DSTHERM INDUSTRIAL LIMITED
                                                                                                           
Verified Supplier
22 Years
Since 2004
Menu

Small Size Ppr Pipe Heating Machine Automatic Control Simple Structure

Price Negotiable
Price: Negotiation
MOQ: Negotiation
Delivery Time: 20 days
Brand: DSTHERM
Product Description

 

 

PPR Welding PPR Socket welder 220V/110V Color according ISO9001 DIN8077/8078

 

 

Application and features:

 

1. Suitable for socket welding pipes and fittings made of PE or PP.

2. Preprogrammed welding parameter enables to choose the heating time by inputting out diameter of pipe to be welded.

3.The structure design complies with DVS2208.

 

Technical Parameters:

1. 20-160mm

2. Max. heating plate Temp: 270

3. Working voltage: 220V 50Hz ,110V 60Hz

 

Technical specifications:

1. This item is suitable for PPR PE,PB pipe material
2. Design with adjustment of temperatures

3. Rated voltage : A C 220/230V 50/60HZ
4. Rated power : 600,800,1200W
5. Working temperature : 200~279 C
6. Ambient temperature :-5C ~45C
7. Other accessories

 

 

External diameter Heating depth Heat time Process time Cool time
20 14 5 4 3
25 16 7 4 3
32 20 8 4 4
40 21 12 6 4
50 22.5 18 6 5
63 24 24 6 6

 

Article Number Size
DS001 20-32mm
DS002 20-63mm 220V
DS003 20-63mm 110V
DS004 75-110mm
DS005 160mm

 

How to use

1. Apply die head

Place the welding machine on the stander, chose die head according to pipe’s diameter, and fix it on the machine. In regular, the small end is at the front, the bigger end at the back.

2. Power on

Power on (make sure the power should be with leakage current protector) , the green light and the red light on, wait till the red light off and keep greenlight on, which indicates the machine enter into auto temperature control mode and the machine can be used.

Note: during the auto temperature control mode, the red and the green light will be on and off alternatively, this indicates that the machine is under control and it will not affect operating.

3. Fusion pipes

Using cutter to cut pipe vertically, push the pipe and fitting into die head without any rotation. Take them off immediately when heating time reached (see the table below) and insert

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company DSTHERM INDUSTRIAL LIMITED
Location Exporting Department 1710 Greenland Technology Center NO.2 Xinjian East Road Shanghai China
Contact Person Johnson Yuan

Request A Quote

Please check your email address.
Your message must be at least 20 characters.