Dongguan Hua Yi Da Spring Machinery Co., Ltd
                                                                                                           
Verified Supplier
26 Years
Since 2000
Menu

Loading wire feeder with high effectiveness, 60 kg to 1000 kg wire decoiler equipment

Price Negotiable
Price: Negotiable
MOQ: 1 Set
Delivery Time: 10 days
Brand: HYD
Product Description

Loading wire feeder with high effectiveness, 60 kg to 1000 kg wire decoiler equipment

 

1. FEATURES AND APPLICATIONS:

 

*Automatic Auxiliary Equipment 200KG Loading Wire Feeder for HYD-40T-3A

*HYD could provide 60KG,100KG,200KG,500KG,1000KG decoiler for additional purchasing.

 

2. SPECIFICATION:

 

Model 200 KG decoiler
Equipment Painting Blue
Diameter of Plate 1100mm
Equipment Size 1100*1100*700mm

 

3.HYD Service:
 

1.There is free training available at the HYD production base.Prior to shipment, images and a video showing the machine in action will be supplied for verification.


2. The patient and knowledgeable consulting service will assist you in determining the best course of action.

 

3. A prompt and secure shipment that complies with your needs, including shipping documentation, booking, and container loading.


4. HYD offers phone and email technical assistance, with professionals on hand to assist you whenever needed.


5. Original cost will apply to spare parts after the one-year guarantee term, after which they will be freely supplied.

 


4.FAQ
 

1. Q: What information will be helping to get an accurate quotation from us?
A: The customer should provide the related drawings, pictures, industrial voltage, planned output, technical requirements, etc
 

2. Q: What is the power supply of the machine?
A: The standard power supply in China is 380V, 3P, 50Hz. We also can customized as per requirement.


3. Q: What is the guarantee period of the machine?
A: The guarantee period is one year from the date of B/L.

 

4. Q: What is the payment term
A: The payment term is 30% deposit as PO confirmation ,and 70% should be finished before the shipment.We also accept other payment term.
 

5 Q: What is the delivery time?
A: Normally the manufacturing time of the machine is 30 days after receiving deposit.But it depends on machine model.Some machine production can be finished within 15 days.
 

6. Q: What is the guarantee period of the machine?
A: The guarantee period is one year from the date of B/L.

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Hua Yi Da Spring Machinery Co., Ltd
Location 101, 4th Building, Xingyue Road No.1, Dalingshan Town, Dongguan, Guangdong Province, China
Contact Person Mandy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.