4T Coking Waste Gas Boiler High Speed For Building Materials Chemical Plant
4T Coking Waste Heat Boiler For Building Materials Chemical Plant
Product Description
The flue gas waste heat recovery blowing is the main measures of energy saving in the fixed bed coal gasifacation, Chang Yu coal gasifacaiton design for gas raw material characteristics, use of plant conditions, especially in flue gas blowing (CO+H2) was designed and the carbon dust amount of combustible content, to make full use of air and flue gas containing dust in the sensible heat, latent heat, heat of combustion of solid mesh.
Technical feature
1. The utilization of waste heat improves the overall efficiency.
2. Generally no burning, low parameter, no explosion tube and oxide skin.
3. Small footprint, fast construction speed.
4. No need to install desulphurization facilities and simple system.
Technical Parameters
|
Model |
Flue gas volume |
Flue gas temperature |
Evaporation |
Steam pressure |
Steam temperature |
|
Unit |
m³/h |
℃ |
t/h |
MPa |
℃ |
|
Q19/1100-6-1.25 |
19000 |
1100 |
6 |
1.25 |
Saturated Vapor |
|
Q29/800-10-2.5 |
29000 |
800 |
10 |
2.5 |
Saturated Vapor |
|
QZ9/1150-4-0.4 |
9000 |
1150 |
4 |
0.4 |
Saturated Vapor |
|
Q15-420-8-2.4/350 |
15000 |
420 |
8 |
2.4 |
350 |
|
Q16-740-5-3.82/440 |
16000 |
740 |
5 |
3.82 |
440 |
|
Q120/900-82-3.82/450 |
120000 |
900 |
82 |
3.82 |
450 |
|
QC28/720-9-1.0 |
12000 |
720 |
9 |
1.0 |
Saturated Vapor |
|
QC18/1200-4-1.25/220 |
18000 |
1200 |
4 |
1.25 |
220 |
FAQ
Q1. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q2. How can I check your factory situation while it's difficult for me to come to China?
A: We have photos and videos, it shows every step of the manufacturing.
Q3. How do you make our business long-term and good relationship?
A: We keep good quality and competitive price to ensure our customers benefit .
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
