Beijing Jincheng Mining Technology Co., Ltd.
                                                                                                           
Verified Supplier
27 Years
Since 1999
Menu

40x3000mm High Pressure Casing Pipe Pvc Deep Water Well Drilling Tools

Price Negotiable
Price: Negotiation
MOQ: 1
Delivery Time: 5-8days
Brand: JCDRILL
Product Description

Specification

Size
(Out Diameter)
(0.80 Mpa) (1.0 Mpa) (1.25 Mpa) (1.6 Mpa) (2.0 Mpa)
mm Inch Weight Thickness Weight Thickness Weight Thickness Weight Thickness Weight Thickness
Kgs/m mm Kgs/m mm Kgs/m mm Kgs/m mm Kgs/m mm
40 1.25     0.41 2 0.47 2.4 0.56 3 0.68 3.7
50 1.5 0.5 2 0.58 2.4 0.72 3 0.85 3.7 1.06 4.6
63 2 0.79 2.5 0.95 3 1.15 3.8 1.41 4.7 1.68 5.8
75 2.5 1.07 2.9 1.3 3.6 1.63 4.5 1.9 5.6 2.39 6.9
90 3 1.53 3.5 1.88 4.3 2.33 5.4 2.8 6.7 3.41 8.2
110 4 1.87 3.4 2.23 4.2 2.82 5.3 3.4 6.6 4.2 8.1
125 4.5 2.41 3.9 2.95 4.8 3.33 6 4.44 7.4 5.4 9.2
160 6 3.89 4.9 4.8 6.2 5.97 7.7 7.24 9.5 8.87 11.8
200 8 6.14 6.2 7.3 7.7 9.31 9.6 11.19 11.9 13.84 14.7
225 9 7.69 6.9 9.1 8.6 11.97 10.8 14.41 13.4 17.53 16.6
250 10 9.51 7.7 11.4 9.6 14.4 11.9 17.7 14.8 21.61 18.4
280 11 11.88 8.6 14.7 10.7 18.2 13.4 22.19 16.6 27.08 20.6
315 12 15.09 9.7 18 12.1 22.89 15 28.17 18.7 34.31 23.2

Production

Material

PVC-U, unplasticised polyvinyl chloride is an ideal material for manufacturing well pipes as it is impervious

to corrosion and chemical action, easy to handle and install, light in weight, non-toxic, and non-conductive.

Its long service life makes it an economical choice over other materials.

Application

FAQ

Q: Are you original manufacturer?
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.
Q: Which payment terms are available to us?
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.
Q: How long will the delivery time take?
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
Q: How about after sales service?
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."
Q:Spare Parts When You Need Them
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Jincheng Mining Technology Co., Ltd.
Location Rm1604, Mansion 2, No.A13 Beiyuan Road, Chaoyang District, Beijing, China
Contact Person Tina Zheng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.