Dome Type Joint Closure Fiber Optic 12 Cores To 96 Cores 3 Inlets And 3 Outlets

Price Negotiable
Price: negotiation
MOQ: 1set
Delivery Time: Negotiable
Brand: HICORPWELL
Product Description

 

 

Dome Type Joint Closure Fiber Optic 12 Cores To 96 Cores 3 Inlets And 3 Outlets

 


Accessories for customers' selection: earthing deriving device, pressure testing valve, buffer tube for bunchy fiber, 1 piece metal hoop


Specification

 

Model Dimension (mm) L*W*H Material Sealing Structure

Cable Capacity

(Port)

Max Capacity

(Core)

GJS98 360*120 PC Mechanical seal  3 in 3 out 12 -96 core bunchy fiber

 

 

 Operations

 

Choose the cable loop with proper outer diameter and let it go through the optical cable. Peel the cable , take off the outer and inner housing, as well as loose contract tube, and wash off the filling grease, leaving 1.1~1.6mfiber and 30~50mm steel core.

 

Fix the cable pressing card and cable, together with cable reinforce steel core. If the diameter of the cable is less than 10mm, first bind the cable fixing point with adhesive tape till the diameter has reached 12mm, then fix it.

 

Lead the fiber into the melting and connecting tray, fix heat contract tube and heat melt tube to one of the connecting fiber. After melting and connecting the fiber, move heat contract tube and heat melt tube and fix the stainless (or quartz)reinforce core stick ,make sure the connecting point is in the middle of the housing pipe. Heat the pipe to make the two into one. Put the protected joint into the fiber-laying tray.

 

(one tray can lay 12 cores)

 

Lay the left fiber in the melting and connecting tray evenly, and fix the winding fiber with nylon ties. Use the trays from the bottom up.

 

After all the fiber has been connected, cover the top layer and fix it.

position it and use the earth wire in accordance with the project plan.

 

Sealing the cable retainer nearing the inlet of splice closure and the joint of the cable rings with sealing tape. And close the unused inlets with plugs, with exposed concave parts of the plug sealed with tapes.

 

Then put sealing trips into the sealing groove on the sides of the shell and grease the concave part of inlet of the body between the two parts of the shell.

 

Then close the two parts of the shell and tighten it with stainless steel bolts. The bolts should be screwed tightly with balanced force.According to the laying requirement, position and fix the hanging tool .

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Hicorpwell Technology Co., Ltd
Location Rm 604 Bldg 9th Yinxingyuan South Rd Nanshan District 518054 Shenzhen China
Contact Person Yvone Si

Request A Quote

Please check your email address.
Your message must be at least 20 characters.