TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

Carbon Steel Structural Steel Tube Hot Finished Seamless Type 3 - 12m Length

Price Negotiable
Price: negotiable
MOQ: negotiable
Delivery Time: Negotiable
Product Description
 
DIN EN 10210-1 Structural Steel Pipe Carbon Steel Hot Finished Seamless Tube

 

DIN EN 10210-1
Hot finished structural hollow sections of non-alloy and fine grain steels
Part 1: Technical delivery conditions
Part 2: Tolerances, dimensions and sectional properties
Cold forming:
Process is done at ambient temperature
Structural hollow section manufacturing process:
Structural hollow sections are manufactured by seamless or by welding.
Welded sections manufactured by continuous process.
Electric welded hollow sections are supplied without trimming the internal weld bead.
Delivery condition:
Qualities JR, J0, J2 and K2 - Hot finished
Qualities N and NL - normalized. (normalized rolled)
- for accelerated cooling +DC
- for quenching and tempering +QT
Surface condition:
The hollow sections have a smooth surface corresponding to the manufacturing method used; bumps, cavities or shallow longitudinal grooves resulting from the manufacturing process are permissible, provided the thickness is within tolerance.
End: Square cut
TABLE 1 Permissible deviations of the product analysis from the specified limits of the cast analysis specified

 
 
Packing & Delivery

Packing Details  : In anti rust protection, in hexagonal bundles of seamless steel tube

Delivery Details  : 30-40days

 
 
 
 
 
 
4. Raw Material Stocking- Segregation
 
5. Packing and Shipment
 
6. Container Loading and Shipment
 
Application

 

 
The structural steel tubes used for liquid transportation

 

 
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time ?

A: It is according to quantity. And usually is 35-50 days after receiving 30% T/T in advance.

Q: How to get the sample of seamless steel tube ?

A: 

1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.

Q: What is your terms of payment ?

A: 

1.T/T: 30% deposit in advance, the balance 70% paid before shipment

2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.