TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

Electric Resistance Welding Round Tubing , Heat Exchanger Carbon Steel Seamless Pipes ASTM A178 / A178M

Price Negotiable
Price: negotiable
MOQ: negotiable
Delivery Time: Negotiable
Product Description
 
 

ASTM A178 Electric resistance welded carbon steel and carbon manganese steel boiler and superheater tubes
 

 

 

1. Applications: for Boilers,Superheaters, Heat-Exchangers, Condensers, Boiler flues, superheater flues and safe ends
2. Material: Carbon Steel and carbon manganese steel
3. Production: Electric Resistance Welding
4. Size range: O.D.:6-127mm W.T.:0.9-9.1mm L: according to customer requirement    

5. Commonly sizes :

OD 3/8"  1/2" 5/8" 3/4" 7/8" 1" 1-1/4" 1-1/2" 2" 2-1/4" 2-1/2" 3"

WT

BWG                                

9---3.76

10---3.40

11---3.05

12---2.77

13---2.41

14---2.11

15---1.83

16---1.65

17---1.473

18---1.244

19---1.067

 

Torich steel tubes supply  welded steel tubes of material Gr A C D  with varying sizes as per standard ASTM A178  which commonly used in Boiler.

 

6. Other relative standard :SA-214 Electric-resistance welded carbon steel heat exchanger and condenser tubes 

SA-226 Electric-resistance welded carbon steel boiler and super heater tubes for high pressure service

 
 
Packing & Delivery

ASTM A178 / A178M Electric Resistance Welding Carbon Steel Heat Exchanger Tubes Packing Details  : In bundles or in wooden boxes packaging

Delivery Details : 30-60days 

In hexagonal bundles packaging with woven 

In hexagonal shaps,the tubes will be well fixed,so it can avoid the damages when delievey .
 

In wooden boxes.

Solid packaging ,protecting tubes from damages much better.
 
 
In poywooden packaging,It cut the packaging costs also it can protect tubes well
 
In bundles with end caps.well protect tubes from rust.
 
Carton Packing suit for the cutting length
 
Our Company
 
 
 

 

 

QUALITY CONTROL

1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking.

 

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

Impact Testing

Tensile Strength Testing

Chemical Composition Testing

FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of ASTM A178 / A178M Electric Resistance Welding Carbon Steel Heat Exchanger Tubes for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.