TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

boiler seamless steel pipe A210 A1 A179 A192

Price Negotiable
Price: negotiable
MOQ: negotiable
Delivery Time: Negotiable
Product Description

seamless boiler steel tube

 

boiler seamless steel pipe A210 A1 A179 A192

 

Applications:
for Boilers,Superheaters,
Heat-Exchangers,
High-pressure Boilers,
Steam Boilers
Cold Condensers and High-Pressure Services,
High-Temperature Services for Boiler Constructions
Manufacture:Tubes are manufactured by seamless process and both hot finished and cold finished are applicable.

boiler seamless steel pipe A210 A1 A179 A192

stainless steel boiler tube
Heat treatment:Hot finished tubes need not be heat treated.Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher

Steel grade SA192 Chemical Composition & Mechanical properties

Mn
P
S
Si
Tensile Strength
Yeild point
Elongation
0.06-0.18
0.27-0.63
0.035Max
0.035Max
0.25Max
min ksi[Mpa] 47[325] 
 min ksi[Mpa] 26[180]  
≥35%   

 

 

Hardness

 

Brinell Hardness
Rockwell Hardness Number
 WT≥0.200in(5.1mm)
 WT<0.200in(5.1mm)
137HRB
77HRB

boiler seamless steel pipe A210 A1 A179 A192

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness,                  Impact, Mictrostruture etc
8~ Packing and Stocking.

.jpg

.jpg

FAQ.jpg

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of boiler seamless steel pipe A210 A1 A179 A192 for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.