Yiwu Tianqi Trading Company
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

High Pressure Fuel Pump For Audi A3 TT VW GTI Tiguan Passat 2.0 06H127026 B 06H127025N

Price Negotiable
Price: Negotiation
MOQ: 10pcs/consultation
Delivery Time: 5-15 work days
Brand: MANER
Product Description

High Pressure Fuel Pump for Audi A3 TT VW Golf GTI Tiguan Passat 06H127026 B 06H127025N

 

 

 

 

MODEL YEAR INFO
Audi A3 2008 CBFA Eng.; CCTA Eng.
  2009  
  2010-2013 GAS
Audi A3 Quattro 2009 2.0L
  2010-2013  
Audi Q3 2015  
Audi TT 2009 CCTA Eng
Audi TT Quattro 2009 2.0L; CCTA Eng
  2010 CCTA Eng
     
Volkswagen Beetle 2013 2.0L; Gas; CBFA Eng; 2.0L; Gas; CCTA Eng
Volkswagen CC 2009-2015 2.0L
Volkswagen Eos 2009 2.0L; CBFA Eng.; 2.0L; CCTA Eng.
  2010-2015  
Volkswagen GTI 2008 CBFA Eng.; CCTA Eng.
  2009-2014  
Volkswagen Golf 2011-2014  
Volkswagen Jetta 2008 2.0L; CBFA Eng.; 2.0L; CCTA Eng
  2009-2010 2.0L; Gas
  2011-2012 2.0L; Gas; Turbo
  2013 2.0L; Gas; CBFA Eng; 2.0L; Gas; CCTA Eng.
Volkswagen Passat 2008 2.0L; CCTA Eng.
  2009-2010 2.0L
Volkswagen Tigua

2009-2015

 

 

 

 

Product Part Number :
  • 06H 127 025
  • 06H 127 026
  • 06H 127 025 N
  • 06H 127 025 G
  • 06H 127 025 E
  • 06H 127 025 K
  • 06H 127 025 M
 
 
Other Part Number:
  • 06H-127-025
  • 06H-127-026
  • 06H127025
  • 06H127026
  • 06H-127-025-N
  • 06H-127-025-G
  • 06H-127-025-E
  • 06H-127-025-K
  • 06H-127-025-M
  • 06H 127 025N
  • 06H 127 025G
  • 06H 127 025E
  • 06H 127 025K
  • 06H127025M
  • 06H127025N
  • 06H127025G
  • 06H127025E
  • 06H127025K
  • 06H127025M
 
 
Product Material:
  • Metal
 
 
Package Composition:
  • Engine 1.8TFSI 2.0TFSI High Pressure Fuel Pump Quantity: 1 ( Part Number: 06H 127 025 )

 

 

 

Check below for more information on placing an order

 

1. Inquiry-Professional quotation.


2. Confirm the price, lead time, packing requirement, payment term etc.


3. Our sales send the Proforma Invoice with seal.


4. Customer make the payment for deposit and send us Bank receipt.


5. Will inform client that we have got the payment, arrange the production & inform the estimated time.


6. End Production-Mass production products photos for approval. You can also arrange the third party Inspection .


7. Clients make payment for balance and we dispatch the goods .Also can accept payment term-Balance against B/L Copy Or L/C payment Term. Inform the tracking number and check the status for clients.


8. Order can be say "finish" when you receive the goods and satisfy with them .

 

 

 

Pictures:

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Yiwu Tianqi Trading Company
Location 4th Floor, No.56th Fangyuan Business Building, Zhongguancun South Street, North Xiaguan Street, Haidian District, Beijing
Contact Person Penny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.