Industrial Stainless Steel Seamless Pipe 304/304L Cold Drawn Tube 515-1035 MPa Tensile Strength
Price:
Negotiable
MOQ:
100
Delivery Time:
5-8days
Brand:
zheheng steel
Product Description
Industrial Stainless Steel Seamless Pipes & Tubes
High-performance seamless pipes and cold drawn steel tubes designed for demanding industrial applications with exceptional durability and long service life.
Material Specifications
Our company specializes in comprehensive steel management, offering seamless pipes, welded pipes, stainless steel pipes, steel plates, flat steel, and various profiles. As authorized agents for major steel manufacturers including Nangang, Longteng Special Steel, and Xingcheng Special Steel, we distribute over 50,000 tons annually across China's coastal regions and international markets.
304 vs 304L Stainless Steel Comparison
304 Stainless Steel
- Density: 7.93 g/cm³
- High temperature resistance: 800°C
- Tensile strength: 515-1035 MPa
- Yield strength: ≥205 MPa
304L Stainless Steel
- Density: 7.93 g/cm³
- Yield strength: ≥205 N/mm²
- Tensile strength: ≥520 MPa
- Elongation rate: ≥40%
- Hardness: HB ≤187, HRB≤90, HV ≤200
Chemical Composition
| Grade | C ≤ | Si ≤ | Mn ≤ | P ≤ | S ≤ | Ni ≤ | Cr ≤ |
|---|---|---|---|---|---|---|---|
| 304 | 0.08 | 0.75 | 2 | 0.045 | 0.03 | 8.00-11.00 | 18.00-20.00 |
| 304L | 0.035 | 0.75 | 2 | 0.045 | 0.03 | 8.00-13.00 | 18.00-20.00 |
International Standards Compliance
Our stainless steel seamless pipes meet multiple international standards including:
- ASTM A213, A312, A269, A778, A789
- DIN 17456, 17457, 17459
- JIS G3459, JIS G3463
- GOST 9941, EN10216, BS3605
- GB13296, NF A 49-117
Industrial Applications
- Chemical Engineering
- Petroleum Industry
- Food Processing
- Nuclear Power
- Aerospace
- Environmental Protection
- Boiler Systems
- Gas Processing
Packaging & Delivery
Packaging Specifications
- Export sea-worthy packaging with waterproof paper and wooden pallets
- Maximum loading capacity: 26.5 metric tons per 20GP container
- Professional loading and securing teams
- Established shipping line partnerships
Delivery Information
- Delivery time: 5-7 days after order confirmation
- Port of shipment: Ningbo
- Payment methods: T/T, Western Union, Trade Assurance
- Insurance: All-risk coverage with third-party testing acceptance
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Wenzhou Zheheng Steel Industry Co.,Ltd
Location
No999 .wenzhou airport wenzhou city,zhejiang china
Contact Person
BAIN SHEN