Seamless/Welded Tube Duplex Stainless Steel Pipe (304 316 316L 310S)
The outer diameter of Stainless steel coiled seamless tubes, Stainless steel coiled pipes, Stainless steel coiled tubings that we could do is in 1/8", 1/4", 1/2", 3/8", 3/4", 5/8"
The wall thickness of Stainless steel coiled seamless tubes, Stainless steel coiled pipes, Stainless steel coiled tubings that we could do is in 0.028", 0.035", 0.049", 0.065", 0.083"
2).30% deposit, the balance against copy of B/L by T/T
3).30% deposit by T/T, the balance by L/C at sight
4).100% L/C at sight
| Model NO. | 321 310S 316 304 304L 301 201 | Surface Treatment | 2b/Ba/Hl/8K/No.4/Etched/Satin |
| Lead Time | 7-15 Days After Payment | Payment | T/T, L/C |
| Trade Term | EXW, Fob CIF, CFR | Sample | Free Sample |
| Processing Service | Bending, Welding, Decoiling, Punching, Cutting | Surface Finish | 2b/Ba/Hl/8K/No.4/Etched/Satin |
| Application | Industry, Chemical, Decoration | Tolerance | +_3% |
| Thickness | 0.3mm - 60mm | Supply Ability | 4000 Tons Per Month |
| MOQ | 1 Ton | out Diamer | 8-1200mm |
| Weld Method | Saw or Tlg | Key Word | Stainless Steel Pipe |
| Producs Name | ASTM312 Hot/Cold Rolled welded Stainless Steel Pipe | Trademark | Zheheng steel |
| Transport Package | Standard Seaworthy Package | Specification | 5.8/6/12m |
| Origin | China | HS Code | 730411900 |
a Various usage
b Good corrosion resistance, durable using
c Good oxidation resistance in different environment
d High strength and high temperature resistance
e Clean, smooth ,mirror surface
| Trade Terms | EXW, FOB, CIF, CRF, DAP |
| MOQ | 1 Ton |
| Payment terms | 1).30% deposit, the balance before loading by T/T 2).30% deposit, the balance against copy of B/L by T/T 3).30% deposit by T/T, the balance by L/C at sight 4).100% L/C at sight |
| Lead time | 5~10 days after get deposit or origin L/C document |
RFQ
Q1: Are you manufacturer ?
A1: We are manufacturer and trader , we build a new trade company to develop our business
Q2: How about the quality ?
A2: We have good processing equipment to weld the steel pipes .
We have good matrial suppliers to keep the good quality of steel .
We have our own lab to test finished steel tubes .
Welcome our customer to test by yourselves .
Q3: How about the delivery time ?
A3: If we have stock, in 7 days . If we dont have stock, 15-20 days /20 tons .
Q4: How about the payment ?
A4: T/T,L/C. Based on your orders .
Q5:How about the samples ?
A5:We supply samples , but we would supply the stock to test . If you want customized samples, we would charge some fee . But the customers pay the transport fee .
Q6:How to cooperate ?
A6: We can supply to your processing directly for manufactuing companies .
If you are traders, also welcome , we want to build a strong bridge between you and us , so if you have a good idea , we can support you !
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
