Automatic Steel Door Frame Cold Roll Forming Machine - 20 Steps, 15-20 m/min Production, 7.5 KW Hydraulic Power
Price:
USD14000-15000per/set
MOQ:
1set
Delivery Time:
30days
Brand:
ST
Product Description
Automatic Steel Door Frame Production Line
High-performance cold roll forming system designed for efficient manufacturing of steel door frames with precision engineering and automated operation.
Technical Specifications
Raw Material Processing
| Material Specification | GI, EG, CR |
|---|---|
| Coil Sheet Thickness | 2mm |
Machine Components
| Roller Material | High grade NO. 45 forged steel with 0.05mm hard chrome plating |
|---|---|
| Shaft Material | High grade NO. 45 carbon wrought steel |
| Cutting Blade | Cr12 mould steel with quenched treatment |
| Cutting Table Material | Cr12 mould steel with quenched treatment |
Performance Parameters
| Forming Steps | 20 rows |
|---|---|
| Productivity | 15-20 m/min |
| Hydraulic Station Power | 7.5 KW |
| Hydraulic Pressure | 10-12MPa |
| Controlling System | Famous PLC computer control |
| Appearance Size | 8m × 1m × 1.5m |
| Weight | 7 tons |
| Hydraulic Oil | 40# hydraulic oil |
| Electric Tension | 380V 50 Hz 3 Phase or as your requirements |
Key Features
- 20-step precision forming process for consistent quality
- High-grade forged steel rollers with chrome plating for durability
- PLC computer control system for automated operation
- 15-20 m/min production speed for high efficiency
- 7.5 KW hydraulic power system for reliable performance
- Compact footprint (8m × 1m × 1.5m) for space optimization
Production Line Images
Frequently Asked Questions
Does one machine produce only one style of panel profile?
Not exactly. For wider and double layer making machines, it can produce more than 6 kinds of panels.
Do you provide after-sales support?
Yes, we offer comprehensive technical support and have skilled technicians available worldwide to ensure your machines remain operational.
What is the warranty period?
Our machines come with a 12-month warranty period. We provide lifetime technical support for all equipment.
How long does it take to manufacture the machine?
Typically, welded pipe making machines are completed within 45 working days. Rush orders can be accommodated in less than one month.
Can you handle transportation arrangements?
Yes, we have extensive experience in international shipping. Please provide your destination port or address for logistics planning.
Contact Information
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Botou Shitong Cold Roll Forming Machinery Manufacturing Co., Ltd.
Location
West Side Of No. 1 Road, Economic Development Zone, Botou, Hebei, China (Mainland)
Contact Person
Jack Wu