Machinery Building Material Machinery Other Construction Material Making Machinery

Half Round Rain Gutter Cold Steel Roll Forming Machine 0.7-1.2mm Thickness 11KW Hydraulic Power

Price Negotiable
Price: 18000-20000 usd per set
MOQ: 1set
Delivery Time: 30 days after receiving the deposit
Brand: ST
Product Description
Half Round Rain Gutter Cold Steel Roll Forming Machine
Professional industrial-grade roll forming machine for manufacturing half round rain gutters from various metal materials with high precision and efficiency.
Half round rain gutter cold steel roll forming machine overview Close-up view of roll forming machine components Detailed view of machine operation and forming process
Technical Specifications
Raw Material Compatibility
Material TypeThickness Range
Sheet, Galvanized Steel Sheet, Aluminum Sheet0.7-1.2 mm
Machine Construction Details
ComponentSpecification
Roller MaterialHigh Grade NO. 45 Forged Steel with 0.05mm Hard Chrome Plating
Shaft MaterialHigh Grade NO. 45 Carbon Wrought Steel
Cutting BladeCr12 Mould Steel with Quenched Treatment
Shaft Diameter60mm
Main Frame300 H Steel
Forming Steps22 Rows
Productivity20-25 m/min (12,000 m/day based on 8-hour operation)
Hydraulic Station Power11 KW
Hydraulic Pressure10-12 MPa
Control SystemFamous PLC Computer Control
Cutting Table MaterialCr12 Mould Steel with Quenched Treatment
Appearance Size10000mm × 1000mm × 1500mm
Hydraulic Oil40# Hydraulic Oil
Electric Tension380V 50 Hz 3 Phase (or as per requirements)
Spare Parts & Components
Spare parts for half round rain gutter roll forming machine Additional spare components and replacement parts Complete spare parts inventory for maintenance
Business Terms & Support
Packaging & Shipping
  • Main machine packaged with plastic film protection
  • All machines require one 20-foot container for transportation
Payment & Delivery
  • Payment Term: 30% deposit by T/T in advance, 70% balance after inspection confirmation before shipment
  • Delivery Time: Within 30 days after receiving deposit
Warranty & Technical Support
  • Two-year comprehensive warranty
  • Lifetime technical support for equipment
  • Free replacement of broken parts within 2 years (including chain, bearing, roller, oil pipe, counting wheel)
  • Online technical guidance until machine operates perfectly
  • On-site engineer assistance available (customer covers engineer costs)
Additional Product Images
Detailed machine assembly and construction view Machine operation and production demonstration Quality control and precision manufacturing features Industrial application and installation examples Complete machine setup and operational overview
Frequently Asked Questions
Does one machine only produce one style panel profile?
Not exactly. For wider and double layer making machines, it can produce more than 6 kinds of panels.
Do you have after sales support?
Yes, we provide comprehensive advice and have skilled technicians available worldwide to ensure your machines keep your business running smoothly.
How to visit your company?
A. Fly to Beijing airport: Take high speed train from Beijing Nan to Cangzhou Xi (1 hour), then we can pick you up. B. Fly to Shanghai Airport: Take high speed train from Shanghai Hongqiao to Cangzhou Xi (4.5 hours), then we can pick you up.
What can you do if the machine breaks?
Our machine has a 12-month warranty period. If broken parts cannot be repaired, we send new replacement parts free of charge (customer pays express cost). After warranty, we negotiate solutions and provide lifetime technical support.
Can you be responsible for transport?
Yes, please provide the destination port or address. We have extensive transportation experience.
Are you a Trade Company or factory?
We are a trade company with our own factories, established specifically for exporting various types of cold roll forming machines.
Why is your price higher than others?
We prioritize quality and invest in developing more automatic, accurate, and high-quality machines. Our equipment lasts over 20 years without problems and includes 2 years of free quality assurance.
How long does it take to manufacture the machine?
Normally, welded pipe making machines require less than 45 working days. For urgent needs, we can complete production in under one month.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Botou Shitong Cold Roll Forming Machinery Manufacturing Co., Ltd.
Location West Side Of No. 1 Road, Economic Development Zone, Botou, Hebei, China (Mainland)
Contact Person Jack Wu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.