Aluminum Alloy FFU Fan Filter Unit for Cleanrooms - 99.99% HEPA Efficiency, 575x1175x300mm Size
Price:
150usd
MOQ:
1pc
Delivery Time:
7-10day
Brand:
YN
Product Description
High-Performance FFU Fan Filter Unit
The FFU Fan Filter Unit is a premium air purification system designed for ceiling installation in cleanroom environments. Constructed from durable aluminum alloy, this unit delivers exceptional filtration performance with 99.99% efficiency at 0.3μm particle size.
Key Features
- Product Name: FFU Fan Filter Unit
- Size: Customized dimensions available
- Air Flow: High-performance airflow capabilities
- Warranty: 1 Year comprehensive coverage
- Power: Customizable power specifications
- Installation: Designed for cleanroom ceiling mounting
Technical Specifications
| Model | YN-FFU-A01 | YN-FFU-A02 |
|---|---|---|
| Size (WxLxHmm) | 575x575x300 | 575x1175x300 |
| Air Flow (m³/h) | 800~900 | 1000~1100 |
| Power (W) | 85 | 95 |
| Weight (kg) | 27 | 37 |
| Noise Level | 55~63 dB (1m below HEPA filter) | |
| Vibration | 0.2~0.7 mm/s | |
| Power Supply | 220V 1PH 50/60Hz (330V 3PH 50/60Hz 110V 1PH 50/60Hz) | |
| Control Mode | 3 levels adjustable manually or group control by computer | |
HEPA Filter Specifications
Efficiency: 99.99% at 0.3μm particle size
Frame: High quality anodized aluminum
Initial pressure drop: 110Pa@0.45m/s±15%
Product Applications
The YN-FFU-A02 Fan Filter Unit is specifically engineered for cleanroom environments requiring superior air purification. With CE, ISO, and GMP certifications, this unit ensures compliance with industry standards for air quality control.
Customization Options
Brand: YN
Model Number: YN-FFU-A02
Certifications: CE ISO GMP
Material: Aluminum Alloy
Humidity Range: 20-90%RH
Minimum Order: 1 piece
Delivery Time: 7-10 days
Frequently Asked Questions
What is YN-FFU-A02?
YN-FFU-A02 is a Fan Filter Unit manufactured by YN, certified by CE ISO GMP with minimum order quantity of 1 piece.
Where is YN-FFU-A02 manufactured?
YN-FFU-A02 is produced in China.
What is the delivery timeframe?
Standard delivery time is 7-10 days with supply capability of 7 days.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Hongkong Yaning Purification industrial Co.,Limited
Location
No. 6, Sanhuan Rd, Chiling Industrial Zone , Houjie Town, Dongguan City, Guangdong Province, China
Contact Person
Nicole