YANING Complete Modular Operating Room Turnkey Solution with ISO Class 5-8 Compliance, Centralized PLC Control, and Single-Source Warranty
YANING delivers the ultimate one-stop design-to-installation turnkey solution for complete modular operating room projects. This comprehensive package integrates wall panels, laminar flow ceiling, hermetic doors, medical pendants, and intelligent control systems into a fully coordinated surgical suite. We manage the entire project lifecycle from initial architectural concept drawings through to a fully operational, validated operating room ready for clinical use.
Ideal for hospital new construction, renovation, and expansion projects, our turnkey OR solution eliminates multi-vendor coordination complexity and ensures seamless system integration under a single warranty.
- Complete One-Stop Delivery: Design, manufacturing, logistics, installation, and commissioning under one contract
- Full System Integration: Wall panels, ceiling, doors, pendants, lighting, and controls from a single source
- Custom Architectural Design: Tailored 3D BIM modeling with MEP coordination drawings
- ISO Class 5-8 Compliance: Validated cleanliness levels with IQ/OQ/PQ documentation package
- Smart OR Integration: Centralized touchscreen control for lighting, airflow, temperature, and humidity
- Single-Source Warranty: Comprehensive 2-year warranty covering all integrated systems
| Room Types Supported | General Surgery, Orthopedic, Cardiac, Neurosurgery, Hybrid OR |
|---|---|
| Cleanliness Class | ISO Class 5-8 (configurable per surgical discipline) |
| Wall System | Electrolytic antibacterial steel panels with seamless joints |
| Ceiling System | Laminar flow ceiling with HEPA H14 filtration |
| Door System | Automatic hermetic sliding doors with sensor activation |
| Control System | Centralized PLC with 10-inch HMI and remote monitoring capability |
- Project Consultation: Requirement analysis, site evaluation, and budget planning
- Architectural Design: 3D BIM modeling with structural, MEP, and medical gas coordination
- Engineering Approval: Submission of detailed shop drawings for hospital and consultant review
- Factory Production: All components manufactured and pre-assembled for quality verification
- Logistics and Shipping: Coordinated container loading with installation-sequence packaging
- Site Installation: Dedicated installation team with cleanroom construction protocols
- Commissioning and Handover: Full system validation, IQ/OQ/PQ documentation, and clinical staff training
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.