Custom Size Investment Casting Parts / Lost Wax Casting Mining Machine Parts
Price:
$1-50
MOQ:
100 PCS
Delivery Time:
30 days
Brand:
NC319
Product Description
Precision Investment Casting Excavating Machinery Support Machine Parts
Product Description
| Production Range |
Machining: CNC Machining/ Lathing/ Milling/ Turning/ Drilling / Tapping/ Broaching etc. |
|
Casting: Investment / Presicion Casting / Silica Sol Lost Wax Casting |
|
| Forging / Stamping / Punching | |
| Material | Carbon Steel, Alloy Steel, |
|
Brass: HPb59-1, CuZn39Pb1/2/3, CuZn40, C36000, C37710, C67400, etc. |
|
|
Aluminum Bronze: QAl11-6-6, CuAl10Fe2/3, CuAl10Ni5Fe5, C65500, C95600, C87500, etc. |
|
| Tin Bronze: CuPb5Sn5Zn5, C83600, C84400, C86500. etc. | |
|
Stainless Steel: SUS304, SUS316, ZG0Cr18Ni12Mo2Ti, SCS14, etc. |
|
| Aluminium alloy: 6061, 2024, etc. | |
| Dimension |
most professional in dimension: 1mm-300mm / 0.03inch -12inch |
| Tolerance | 0.001mm-0.01mm-0.1mm |
| Weight | most professional in weight 0.001kg-15kg |
| Finish |
shot/sand blast, heat treatment, annealing, tempering, polishing, anodizing, zinc-plated |
| MOQ | For casting parts: 300kgs |
| For Machining: 50pcs | |
| Lead Time | 30days |
Our Service
•Professional manufacturer customized metal,one stop source for new project developing.
•Quick response to all your inquiry
•Free samples can be provided
•Custom logo printing, OEM / ODM service
•Strict inspection procedures to guarantee the good quality of each shipment
•Fast delivery and competitive price
•Quick response to all your inquiry
•Free samples can be provided
•Custom logo printing, OEM / ODM service
•Strict inspection procedures to guarantee the good quality of each shipment
•Fast delivery and competitive price
FAQ
Q1:What about the leading time?
A1:In general, the leading time is about 35 days. But please confirm the exact delivery time with us as different products and different quantity will have different leading time
Q2:How to get a sample?
A2:Sample order is acceptable. Please contact with us and make sure what sample do you need, in general,
It will take 25 days to finish your sample.
It will take 25 days to finish your sample.
Q4: How about the payment clause?
A4:We accept 30%T/T in advance,the 70% balance before the delivery.
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Sunrise Foundry CO.,LTD
Contact Person
Paul

