MT-2 MARK 50 Precision Investment Castings Railway Buffer Gear Housing
Price:
$1-60
MOQ:
100 pcs
Delivery Time:
30 days
Brand:
NC901
Product Description
Qualified OEM Design MT-2 MARK 50 Investment Casting Railway Buffer Gear Housing
Description
We can produce and supply with you following type of draft gear for railway vehicles,ex: MT-2 ,MK50 draft gear ,MT-3 buffer,
and Stucki type ,etc.
Product Features
With the advantages of low inpedance, large capacity, high absorptivity, steady performance, long lifetime, and easy to install and use,
the buffer meets the requirement of braking for the general rail wagons and heavy wagons.
Product Details
| Model | Material | Standard |
| MT-2 | Grade E casting steel | TB/T2942-1999 |
| MT-3 | Grade E casting steel | TB/T2942-1999 |
| Stucki | Grade E casting steel | AAR M-201 |
| Name | Main Parameters | |||
| X (mm) | Y (mm) | Z(mm) | Weight(kg) | |
| MT-2 Draft gear | ≤561 | 320 | 227 | 175 |
| Model | Main Performance Parameters | ||||
| resistance | Stroke | initial capacity | official capacity | absorptivity | |
| (MN) | (mm) | (KJ) | (KJ) | % | |
| MT-2 Draft gear | ≤2.27 | ≤83 | ≥40 | ≥50 |
≥80 |
Our Service
Quotation / RFQ: Price will be worked out in one day, you'll get fastest reply.
Production Process: Our senior engineer will provide you with the most suitable production process in
economic way to save cost for you.
Sample production:15-25 days according to customers' drawing.
Mass production: 25-30 days.
QC:100% inspection before shipment, 3rd part quality inspection is allowed.
Packing: All parts will be packed properly to avoid being rusted or damaged.
After sale service: All customers' feedback are very important to us. After customers receive the goods,
once any issued parts to be found in a shipment, we'll take measures to protect customers' benefits.
How do you control your quality?
A. Produce machine have Regular maintenance.
B. From raw materials to the end produce process, every step must in according with ISO9001 standard.
C. Materials should be brought from big steel company, Mill Sheet must be showed. QC team must following all produce progress and make detailed testing records of the quality checking.
D. Third Party inspection is accepted.
B. From raw materials to the end produce process, every step must in according with ISO9001 standard.
C. Materials should be brought from big steel company, Mill Sheet must be showed. QC team must following all produce progress and make detailed testing records of the quality checking.
D. Third Party inspection is accepted.
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Sunrise Foundry CO.,LTD
Contact Person
Paul
