Sunrise Foundry CO.,LTD
                                                                                                           
Verified Supplier
36 Years
Since 1990
Menu

Ductile Iron Resin Sand Casting Brake Head for Train Brake System

Price Negotiable
Price: Can talk
MOQ: 100 pcs
Delivery Time: 30 days
Brand: NC9084
Product Description

Ductile Iron Resin Sand Casting Brake Head for Train Brake System

 

Product Details

 

Technology Process

green sand casting,resin bonded casting, compression casting, investment casting(lost wax casting), die casting, pressing & forging etc.

Machining: complete machining such as Machining center, CNC, Lathe, Milling machine, drilling etc.

Material Grey Iron, Ductile Iron
Surface Treatment shot blasting,deburr, phosphating, spray lacquer etc
Size As per the customer's drawings and requirements
As per the customer's samples
Certification ISO9001:2000

 

Application

valves parts, Auto parts, machinery parts, locomotive part,

marine part, truck part, Garden fence accessories

Standard DIN, ASTM,BS, JIS etc

Our Service

 

1.Drawing:We will translate your original drawing; make manufacturing procedure plan, offer professional suggestions on the design if needed.

2.Engineering design software: Solidworks, AutoCAD.

3.Quality control: We have full set of quality control system to guarantee best product quality. Depends on the products, we make different item testing plan, different manufacturing procedure and provide certified lab mechanical testing.

4.Sample:Samples available.

 

FAQ

 

1. How long can I get the price?

 

Prices will be quoted within 24 hours after we get your inquiry with detailed information ( including drawings, material, surface treatment,quantity, special requirements,etc).

 

2.How can I get a sample to check your quality?

 

On the case of quotation confirmation.Sample will be free of charge for customer approval, freight collect.

 

3.How long can I expect to get the sample?

 

It depends on, normally 15 days~30 days (including mould making time). Samples will be shipped by DHL, FedEx, UPS, TNT or EMS,ect.

 

4.What about the leading time for mass production?

 

It depends on the order quantity. Normally, 15~40 days after receiving of deposit or L/C.

 

5.What is your MOQ?

 

We don't have a strict limit, small quantity is also workable.

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Sunrise Foundry CO.,LTD
Contact Person Paul

Request A Quote

Please check your email address.
Your message must be at least 20 characters.