CHANGZHOU JKONGMOTOR CO.,LTD
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

3kw ER20 220v Square Air Cooled Cnc Router Spindle With Inverter

Price Negotiable
Price: US$ 292 ~ US$ 330
MOQ: 3-10pcs
Delivery Time: For samples , 7-15 days / For batch , 15-25days
Brand: Jkongmotor
Product Description

 

3kw ER20 220v/380v Air Cooled Square Spindle Motor with Inverter CNC Router Kit 

 

 

Features:

Cooling: Air cooled, Power: 3kW, Current: 10A, Collet: ER20

Voltage: 220V/380V AC at 300/400Hz, cooled spindle motor speed: 1-18000/24000 R/min

Fast response, strong overload capacity, low noise and high mechanical precision.

Tight sealing and two-layer dustproof design.

 

Spindle Specification:

 
 

Inverter Specification:

 

lnverter

Model

Braking resistor

Specification

Special

Motor KW

  W Ω  
YL620-1.5KW-220V 100W 100Ω 1.5KW
YL620-2.2KW-220V 100W 70Ω 2.2KW
YL620-3.0KW-220V 300W 65Ω 3.0KW
YL620-4.0KW-220V 400W 45Ω 4.0KW
YL620-5.5KW-220V 800W 22Ω 5.5KW
YL620-1.5KW-380V 150W 220Ω 1.5KW
YL620-2.2KW-380V 250W 200Ω 2.2KW
YL620-3.0KW-380V 250W 180Ω 3.0KW
YL620-4.0KW-380V 300W 130Ω 4.0KW
YL620-5.5KW-380V 400W 90Ω 5.5KW

 

 

 

 

 

Provide:

1. water cooling:800w,1.5kw,2.2kw,3kw,4kw,3.2kw,4.5kw,5.5kw
2. air cooling: 800w,1.5kw,2.2kw.3.5kw,4.5kw,6kw,7.5kw,12kw

 

Instructions

1. Rotate the shaft head of the electric spindle by hand before installation, it should feel flexible and free from blockage

2. Correctly connect the quilt head of the electric spindle's inlet and outlet pipes, and check whether the connection is leaking and unobstructed. After the water-cooled electric spindle starts to stop, the circulating coolant must be turned on for cooling.

3. The electric spindle must be used in conjunction with the frequency converter, and the selection of the frequency converter should match the range of voltage, power, and frequency of the electric spindle.

4. Connect the inverter to the three-phase power supply of the electric spindle. The three-phase power cord of the inverter should be welded to the plug 1 (U1), 2 (V1), 3. (W1) pins, and the 4 pin is the ground wire. Then the inverter is connected to the external power supply. After the power is turned on, the color changer jogs and observes whether the rotation direction of the electric spindle is consistent with the direction indicated by the electric spindle. If the rotation direction is inconsistent, shut down immediately, and exchange the U, V, W on the three-phase power supply connected to the inverter and the electric spindle. Any two will do.

5. When installing the spring chuck on the electric spindle, please clean the inner hole of the shaft head and the dirt on the surface of the spring chuck to avoid reducing the accuracy. The spring chuck should not be installed with tools during assembly and disassembly to avoid damage to the ring tool. Do not use excessive force when chucking.

6. When the electro-spindle is stopped, the power supply should be turned off first, and then the cooling should be turned off after it has completely stopped. If it is out of use for a long time, compressed air should be used to blow out the residual coolant in the cooling pipeline.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHANGZHOU JKONGMOTOR CO.,LTD
Location Building A2,Hutang Industrial zone,Lingdao Rd,Wujin District,Changzhou,China.Zip:213162
Contact Person Annie

Request A Quote

Please check your email address.
Your message must be at least 20 characters.