XY-1A Hydraulic Core Drilling Rig - 150 Meter Capacity
The XY-1A drilling rig is a hydraulic feed portable drilling system with 150 meters drilling depth and 150mm hole diameter capacity. This high-speed, high-torque belt-driven rig with integrated pump is engineered for geological exploration in industrial, civil construction, railway, hydropower, transportation, bridge, and dam foundation projects.
Technical Specifications
| Drill Specifications |
| Maximum Drilling Depth |
150 meters |
| Hole Diameter |
150mm maximum |
| Drill Rod Diameter |
42mm |
| Angle Range |
90-75 degrees |
| Swivel Head |
| Spindle Speed |
1010, 790, 470, 295, 140 (r/min) |
| Spindle Stroke |
450mm |
| Spindle Pull-down Force |
Maximum 15KN |
| Spindle Lifting Capacity |
Maximum 25KN |
| Power & Pump Systems |
| Oil Pump Model |
YBC-12/125 |
| Oil Pump Rated Pressure |
12.5Mpa |
| Water Pump Model |
Horizontal reciprocating single-acting piston pump |
| Water Pump Working Pressure |
Maximum 1.25Mpa |
| Diesel Engine Model |
ZS1105 |
| Rated Power |
12.1KW |
| Hoist & Dimensions |
| Maximum Lifting Capacity |
15KN |
| Hoisting Drum Revolution |
121, 76, 36 (r/min) |
| Drum Diameter |
140mm |
| Overall Weight |
Approximately 600KG |
| Dimensions |
1620 × 970 × 1560mm |
Key Advantages
- Hydraulic automatic feeding mechanism enhances drilling efficiency and reduces operator fatigue
- Ball card clamping system replaces traditional chuck for non-stop bar operation with enhanced safety
- Dual-sided support star structure in hoist withstands heavy impact loads
- Four-bearing vertical axle box provides superior rigidity for challenging geological conditions
- Taper clutch design delivers high transmission torque with minimal maintenance requirements
Applications
XY-1A drilling rig is engineered for geological investigation, road and building foundation exploration, concrete structure drilling, river levee projects, geothermal applications, and central air conditioning installations. This spindle core geotechnical drilling system is ideal for borehole drilling in geo-construction and geo-technical exploration projects including civil construction, railway development, hydropower facilities, highway construction, bridge engineering, and dam construction.
Operation Guidelines
Important Safety & Operation Notes:
- Engage clutch and rotate working wheel with smooth, uniform motion
- Disengage clutch before changing speeds or transferring handles
- Never press both left and right handlebars simultaneously during lifting operations
- Monitor oil pressure gauges and adjust hole bottom pressure gradually
- Clean and lubricate guide rails before moving equipment
- Regularly check for unusual sounds and monitor component temperatures
Product Images