Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

200m Engineering Spt Portable Drilling Rig For Water Well

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 7-12 days
Brand: JINZHOU SHITAN
Product Description

Hydraulic Water Well Drilling Machine Water Well Drill Rig Bore Hole Equipment For Sale

 

 

Brief introduction of drilling rig

 

Hydraulic portable drilling machine is a hydraulic feed portable core drilling machine. The drilling machine is suitable for geological drilling buildings such as mountains and hills, river tunnels and other complex terrains. Engineering geological prospecting for petroleum geophysical prospecting drilling holes, blasting Po holes and other drilling to meet the needs of different users, the drilling machine can choose diesel engine Any of the three powers of a gasoline engine or electric motor, diesel by default

 

GK200 Hydraulic Portable 200m Water Well Drilling Machine

 

Drilling depth 200m
Open hole diameter 75-300mm
End hole diameter 75mm
Active drill rod 53/59*4200mm
Rod diameter 50,60mm
Drill angle 90°-75°
Matched power(diesel power) 15kw/2200r/min
Dimension 2800*950*1700mm

 

Application

 

1. The rig is compact in structure, small in size, light in weight, but also can be quickly disassembled, easy to handle, for mountainous areas and hills and other field complex terrain work has brought great convenience

2. Compared with similar products, the drilling rig is equipped with a double cylinder hydraulic feeding system, which enables fast drilling, high working efficiency, stable performance and low maintenance rate.

3. The rig operation panel is equipped with a pressure gauge at the bottom of the hole to indicate the pressure, which is easy to master the conditions in the hole. The operator can make adjustments according to different terrain conditions and reduce the drilling accident rate. The rig is equipped with a high-performance

4. gear change system to facilitate the operator to freely adjust the positive rotation speed according to the geological conditions, and also equipped with ultra-slow reverse gear, convenient for the operator to remove the drill pipe and drill tool, improve the efficiency of lifting and changing drill pipe, reduce the labor intensity of the operator 5. The rig is equipped with fixed clamping mechanism and one main rod, without drilling tower, the work is more simple

 

FAQ
 
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 10-20 days if the goods are in stock. or it is 20-30 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A:Sorry, free sample is not available.
Q: What is your terms of payment ?
A: Usually we accept T/T 30% in advance, then pay the 70% T/T before shipping.
Q:How to order?
A:Please send us your inquiry with detail item description or with Model number.
If there is no packing demand we take it as our regular exported standard packing.
We will offer you an order form for filling. We will recommend you the most suitable model according to information you offered.
After you send your detail requirement, we provide quotation to you.
Q:Can I expect a quality products?
A:All the production and processing are strictly according to international standard. At the same time, mature production technology ensuring the quality satisfy international request. We also welcome the third party inspection, such as BV, SGS and TUV.
 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person Anna

Request A Quote

Please check your email address.
Your message must be at least 20 characters.