ST 200 Pneumatic Water Well Drilling Rig - 200m Depth, 85Kw Engine for Large Borehole Operations
Price:
Negotiation
MOQ:
1 set
Delivery Time:
7-10 days
Brand:
JINZHOU SHITAN
Product Description
ST 200 Pneumatic Water Well Drilling Rig
High-performance drilling rig designed for large borehole blasting operations with advanced hydraulic systems and versatile drilling capabilities.
Product Overview
The ST 200 drilling rig features multiple positive speed stages with a 14-500 RPM range and output torque of 13428-250 N.m. Equipped with 2 reverse speeds for efficient accident handling, the rig utilizes dual oil pump systems for optimal performance - single pump for drilling and dual pump confluence for lifting operations, minimizing power loss and reducing auxiliary time.
Technical Specifications
| Parameter | Specification |
|---|---|
| Drilling Depth | 200m |
| Hole Diameter | φ140-200mm |
| Advance Length per Cycle | 6.6m |
| Working Pressure | 1.7-3.0MPa |
| Air Consumption | 17-35m³/min |
| Rod Length Options | 1.5m, 2m, 3m, 6m |
| Rod Diameter Options | φ76, φ89, φ102, φ114 |
| Lifting Power | 24T |
| Rotation Torque | 8500-11000N.m |
| Rotation Speed | 40-70r/min |
| Diesel Engine | Yuchai |
| Engine Power | 85Kw/2200rpm |
| Travelling Speed | 0-2.5 Km/h |
| Climb Capacity | 30° |
| Weight | 9000kgs |
| Dimensions | 5900x2000x2850mm |
| Application | Complex geological conditions: Rock, Mud, Sand etc. |
| Drilling Methods | Top drive hydraulic rotary and propulsion, DTH Drilling or Mud Pump Drilling |
| DTH Hammer Compatibility | 4", 5", 6", 8" Drill hammer or CIR110, 130, 150, 170 |
Key Advantages
- Complete well drilling in 1 day - effectively shortening construction periods
- Proven durability with 10+ years of reliable service life
- Capable of drilling depths up to 1600 meters
- Exceptional fuel efficiency saving 20-30% on diesel consumption
Operation Guidelines
Essential Safety and Performance Protocols
- Engage clutch or rotate working wheel gently, evenly, and steadily
- Disengage clutch or stop work wheel before changing speeds, engaging gearboxes, or operating transfer handles
- Never press both left and right handlebars simultaneously when using the lift
- Monitor oil pressure gauge and hole bottom pressure indicators after starting gear oil pump
- Adjust hole bottom pressure gradually during drilling - avoid sudden increases or decreases
- Use oil pressure system for quick vertical shaft lifting only under original load conditions to prevent component damage
Product Images
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Jinzhou City Shitan Machinery Equipment CO. LTD.
Location
Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person
Anna