Hebei Greens Building Material Technology Development Co.,Ltd
                                                                                                           
Verified Supplier
13 Years
Since 2013
Menu

Building Insulation Systems Rock Wool Sheet Making Machinery Production Line

Price Negotiable
Price: US $2000000-4000000
MOQ: 1
Delivery Time: 90 days
Brand: Greenson
Product Description
Building Insulation Systems Rock Wool Sheet Making Machinery Production Line

The raw materials used in rock wool production include basalt, dolomite, binders, etc. The raw materials are loaded into the hopper by the elevator, and the melting furnace is heated and melted into the melt flow tank. The lava flow is cooled and spun into fibers by the centrifuge, and then sprayed into the fiber molding room. The binder is added during the spraying process, and the fibers are heated by the negative pressure wind. Pull down to the mesh belt to form the original felt. The mesh belt transports the original felt to the pendulum cloth machine to swing the cloth. The original felt after the swing cloth is transported to the curing furnace by the cloth machine, and runs forward between the upper and lower chain belts. The hot air blower blows the hot air into the curing furnace. The cotton felt in the furnace is solidified, and the solidified products are cut, first longitudinally cutting, and then transversely cutting, and the finished product is packaged and put into storage.

Product Parameters
Specification Details
Application Manufacture Rock Wool Blanket, Rock Wool Board
Capacity 10000tons/year, 20000tons/year, 30000tons/year, 40000tons/year, 50000tons/year, 60000tons/year, 70000tons/year, 80000tons/year
Raw materials Basalt, dolomite, binders and so on
Main energy supply system
  • Raw coal energy supply system
  • Power energy supply system
  • Natural gas energy supply system
Frequently Asked Questions
Q: Where is the factory located?
A: We are located in Shijiazhuang, Hebei Province.
Q: What is your delivery time?
A: Usually, we make merchandise inventory. If we have the products in stock, the delivery time is 30-60 days after receiving the deposit. If we don't have the products in stock, we will arrange the production immediately, with delivery time of 1-3 months depending on order quantity.
Q: How can we ensure quality?
A: The final inspection is always carried out before shipment.
Q: How to install the equipment after purchasing?
A: Professional designing, manufacturing, installation and commissioning team. On-site installation and commission until the production of qualified products.
Q: Do you offer a guarantee?
A: Yes, we guarantee our product for one year. Provide after-sales service support with technical support.
Rock Wool Sheet Making Machinery Production Line

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hebei Greens Building Material Technology Development Co.,Ltd
Location No.,17,Nanyan Road,Economical Technological Development zone,Shijiazhuang City
Contact Person Wendy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.