Guangzhou Binhao Technology Co., Ltd
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

BOPP Film High Rate Shrinkage 5-8% Thickness 21 Micron Inner Core 76mm

Price Negotiable
Price: Negotiable
MOQ: 3 T
Delivery Time: 15 work days
Brand: BINHAO
Product Description

 

 

BOPP Film High Rate Shrinkage 5-8% Thickness 21 Micron Inner Core 76mm

 

 

 

 

 

Place of Origin China
Brand Binhao 
Thickness 10mic - 80mic
Width 100mm - 3000mm
Standard ISO9001:2020
Usage Packaging
Packing Loose Packing / Pallet Packing / Carton Packing
Color Transparent / Opaque / Colored
Corona Treatment One Side / Both Side
Processing Type Extrusion
Hardness Soft
Heatsealable None / One Side / Both Side
Core Dimension 1 Inch - 3.5 Inch
Logo Printing Available
Customization Customizable as per Customer Requirements

 

 

Anti-static agents are generally added to the middle layer of the film.

Therefore, in order to obtain better anti-static effect, the film generally needs a certain storage period.

In the cigarette factory packaging machine, static electricity can be quickly conducted through metal or electrostatic eliminator and transfer, in addition to the humidity environment is also conducive to the film surface electrostatic.

In case of large electrostatic film or dry season (such as winter), torch factory can put the film into the packaging workshop in advance, the packaging workshop can adjust the humidity is the most ideal, or wet workshop floor with water, or wet towel on the end of the film roll, is one of the emergency solutions.

 

 

 

 

Shipping & Packaging

 

*One Roll BOPP Thermal Laminating Film

*18 rolls in a pallet

*10 to 12 pallets loaded into 1*20FCL (appro. 13MTs)

*Or 20 to 22 pallets loaded into a 40 feet container (appro. 25MTs)

 

 

Payment Terms:

 

Payment Terms: 30% T/T deposit in advance; balance at sight of the copy of B/L.
Production Lead Time 20FT container: 15 days after received the deposit.
40GP/HQ: 17-25 days after received the deposit.
Transportation By sea or by railway.
Port Guangzhou Port
Remark If you want to deal with EXW/CIF/CNF term instead of FOB, please specify. Otherwise, FOB price will be quoted under inquiry.

 

 

 

 

 

 

 

 

BOPP Film High Rate Shrinkage 5-8% Thickness 21 Micron Inner Core 76mm

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Binhao Technology Co., Ltd
Location R&F New World Center Building, No.307 Middle Of Guangzhou Avenue, Guangzhou, China
Contact Person Cassie Zhang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.