Automatic Galvanized Shutter Door Roll Forming Machine For Shutter Slats Production

Price Negotiable
Price: Negotiation
MOQ: 1 Set
Delivery Time: 30 days
Brand: Lebron-Machinery
Product Description

PLC Control Automatic galvanized Shutter Door Roll Forming Machine Shutter Slats

 

 

1. Description of shutter door roll forming machine

 

Now, there are lots of rolling slats on the market, such as C shape, W shape, etc. Rolling Shutter Making Machine is always required for the manufacturing of profiles for rolling shutter doors to raise up and lowered down. Normally, the regular thickness of the galvanized steel strips which for roll form shutter door profiles is 1.2-2.0mm thickness.

 

Normally, a Rolling Shutter Door Making Machine for the production of rolling shutter door profiles generally consists of an Uncoiler, Leveler device, main Roll Forming system, Transmission system (chain-brackets or gearbox), Cutting Device, Hydraulic Station, PLC control cabinet and run-out tables.

 

Meantime, due to the heavy duty materials, a Rolling Shutter Making Machine for profiles usually have two types of transmission available for customers to choose: Chain-brackets transmission and Gear-box transmission.

 

 

2. Major technical parameters of shutter door roll forming machine

 

No. Item Name Specification
1 Suitable material GI, Aluminum coil or strip
2 Thickness  1.2 ~2.0 mm
3 Roller station 15 stations
4 Shaft Diameter Dia 75 mm
5 Productivity 8-12 m/min
6 Rollers' material 45# steel, quenched, plated hard chrome
8 Weight Approx 5 tons
9 Length 5m
10 Voltage 380V 50Hz 3phases
11 Control system PLC
12 Decoiler 3 tons
13 Main power 7.5 kw
14 Driving way Chain transmission
15 Chain size 2 inch
16 Cutting system Hydraulic cutter

 

 

3. Major components of shutter door roll forming machine

 

No. Name Quantity
1 5 tons Manual De-coiler 1 set
2 Main roll forming machine 1 set
3 PLC Control Cabinet 1 unit
4 Hydraulic Station 1 unit
5 Receive Tables 2 units

 

 

4. Installation service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Lebron Machinery Technology Co., Ltd.
Location 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China
Contact Person Alfred

Request A Quote

Please check your email address.
Your message must be at least 20 characters.