Soncap 20m/Min Metal Stud Roll Forming Machine 70mm Shaft

Price Negotiable
Price: USD 10000~30000 per Set
MOQ: 1 Set
Delivery Time: 30 days
Brand: Lebron-Machinery
Product Description

Full Automatic High-Speed Stud And Track Forming Machine Steel Construction Usage

 

 

1. Description:

 

Steel Stud and Track Roll forming machines are very popular in the metal base industry, therefore, we provide you with stud and track roll forming machines. This type of roll forming machine is very popular in the metal industrial construction of metal or metal profiles. The construction of the metal industry has always been popular because we have created efficiency for running the metal industry, so we have provided this equipment.

 

Provide the best stud and track roll forming machine at a reasonable price

 

 

2. Main Technical Parameters

 

No. Item Description
1 Main Power 5.5KW
2 Drive System Chain
3 Roll Forming Speed over 20m/min
4 Roller Station 12 stations
5 Roller Material 45# steel, quenched. Coated with 0.05mm chrome
6 Shaft Material 45# steel, quenched, coated with 0.05mm chrome
7 Shaft diameter 70mm

 

 

3. Workflow:

 

Uncoiling → Feeding & Guiding → Roll Forming → Hydraulic Punching → Servo Tracking Cutting → Receiving

 

 

4. Main Components

 

No. Name Quantity
1 3-Ton Decoiler 1 Set
2 Feeding Guider 1 Set
3 Roll Forming Machine Unit 1 Set
4 Hydraulic Punching Device 1 Set
5 Hydraulic Servo Tracking Cutting Device 1 Set
6 Hydraulic Station 1 Set
7 Receiving Table 1 Set
8 Electric Control Cabinet 1 Set

 

 

5. Brands of Electrical Appliances

 

No. Name & Brand Brand
1 PLC Germany Siemens
2 Frequency Converter Japan Yaskawa
3 Touch Screen Germany Siemens
4 Encoder Japan Omron
5 Other Electrical Accessories France Schneider

 

 

6. After-Sale Service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Lebron Machinery Technology Co., Ltd.
Location 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China
Contact Person Alfred

Request A Quote

Please check your email address.
Your message must be at least 20 characters.