Copper Metal Shear Pin Parts For MK9 Making Machine

Price Negotiable
Price: Negotiable
MOQ: 100 pcs
Delivery Time: 5-8days
Brand: Upperbond
Product Description

Metal Shear Pin Parts For MK9 Making Machine

Introduction:

 

Product Name Shear Pin
Brand UPPERBOND
Material Copper
Part Number YJ14-16.17-10
Machine Type For MK8,MK9
MOQ 100PCS
Lead time 7-10 days
Frieght DHL / FEDEX / TNT Etc

 

 

Quality Control:

 

Material inspection--Check the material surface and roughly dimension.

 

Sampling inspection--Check the quality before sending to the warehouse.

 

Production first inspection--To ensure the critical dimension in mass production.

 

Pre-shipment inspection--100% inspected by QC assistants before shipment.

 

Q&A

 

1. Are you a manufacturer or a trading company?
We are a 3000-square-meter factory located in China.

2. Can you provide samples before mass production?
Sure, sample fee is needed, will be returned when mass production if possible.

3. How about the lead time?
Generally, 5-10 days for samples, 2-4 weeks for mass production.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company HK UPPERBOND INDUSTRIAL LIMITED
Location RM 18S, 27/F, HO KING COMM CTR, 2-16 FAYUEN ST, MONGKOK KOWLOON, HONG KONG
Contact Person Henry

Request A Quote

Please check your email address.
Your message must be at least 20 characters.