Guangzhou DongAo Electrical Co., Ltd.
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu

Small Industrial Grade Dehumidifier Machine Microcomputer Automatically Control

Price Negotiable
Price: negotiable
MOQ: negotiable
Delivery Time: 45days
Brand: PARKOO
Product Description
6.8L/HOUR small industrial dehumidifier Machine Factory Price Industrial Dehumidifier
 
Product Description

 

 

1. Dehumidifier Functions

 

1) Microcomputer automatically control,LED digital display
2) Efficient automatic defrosting system,low temperature appliance
3) Have fault automatically judgment fuction
4) 1-24 hours timing function
5) Special humidity 1%RH can be adjusted, humidity setting range 10~98%RH
6) Pipe continue drainage function
7)
The bottom have universal wheel, in all direction, no dead angle, free movement


2. Parameters

 

Article No. CF6.8DT
Article Name Industrial Dehumidifier
Dehumidify Capacity 6.8L/HOUR
Applying Area(with three meters height) 200~250M2
Voltage 220V/50Hz
Rated Input Power 1900W
Maximum Power 2300W
Air Circulation 1200M3/H
Refrigerant R22
Compressor Mitsubishi , Daikin
G.W.(KG) 105KG
Packing Dimension 720*550*1610mm

 

Related Products

Main category

Company Information

Certifications

FAQ

1. Can you customize the product?

Yes, we can customize any products according to customer's requirements.

 

2. Which payment terms are you doing?

L/C, T/T, (100% payment in advance.)

 

3. Which shipment is available?

By sea, by air, by express or as your requirement.

 

4. Are you a factory or trading company?

We are a factory which specialized in produce dehumidifier about 13years.

 

5. How long is the warranty period for the product?

We provide 1-year warranty for our products.

 

6. Do you accept OEM or ODM?

Yes, we do. We sincerely welcomed.

 

7. Can I buy 1 or 2 pieces of samples for testing before bulk order?

Yes, we are pleased to send you samples for the quality and performance test.

 

8.What about the delivery date?

If we have free stocks of the item you need, it can be sent within 1 week after receiving deposit or 100% payment into our bank account.If we don't have free stock, the delivery date can be different for different products. Generally speaking, it will take 35 to 45days.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou DongAo Electrical Co., Ltd.
Location No.109,Huanhua Road,Liwan District,Guangzhou City,Guangdong China
Contact Person Ho

Request A Quote

Please check your email address.
Your message must be at least 20 characters.