Guangzhou DongAo Electrical Co., Ltd.
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu

Unique Industrial Grade Dehumidifier With Drying Function 12kg / Hour

Price Negotiable
Price: negotiable
MOQ: negotiable
Delivery Time: 45days
Brand: Parkoo
Product Description
Product Description

 

1. Functions

 

1) New and unique design, nice appearance, suing high strength 1.0mm thick cold rolling steel plate
2) Microcomputer automatically control,LED digital display
3) Efficient automatic defrosting system,low temperature appliance
4) Have fault automatically judgment fuction
5) 1-24 hours timing function
6) Special humidity 1%RH can be adjusted, humidity setting range 10~98%RH
7) Pipe continue drainage function
8) The bottom have universal wheel, in all direction, no dead angle, free movement


2. Parameters

 

Article No. CF12SD
Article Name Industrial Dehumidifier
Dehumidify Capacity 12L/HOUR
Applying Area(with three meters height) 300~380M2
Voltage 380V/50Hz
Rated Input Power 3700W
Maximum Power 4700W
Air Circulation 2000M3/H
Refrigerant R22
Compressor Mitsubishi , Daikin
G.W.(KG) 165KG
Model Dimension 790*500*1735mm
PACKING Dimension 890*640*1800mm
Related Products

Main category

Company Information

Certifications

FAQ

1. Can you customize the product?

Yes, we can customize any products according to customer's requirements.

 

2. Which payment terms are you doing?

L/C, T/T, (100% payment in advance.)

 

3. Which shipment is available?

By sea, by air, by express or as your requirement.

 

4. Are you a factory or trading company?

We are a factory which specialized in produce dehumidifier about 13years.

 

5. How long is the warranty period for the product?

We provide 1-year warranty for our products.

 

6. Do you accept OEM or ODM?

Yes, we do. We sincerely welcomed.

 

7. Can I buy 1 or 2 pieces of samples for testing before bulk order?

Yes, we are pleased to send you samples for the quality and performance test.

 

8. What about the delivery date?

If we have free stocks of the item you need, it can be sent within 1 week after receiving deposit or 100% payment into our bank account.If we don't have free stock, the delivery date can be different for different products. Generally speaking, it will take 35 to 45days.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou DongAo Electrical Co., Ltd.
Location No.109,Huanhua Road,Liwan District,Guangzhou City,Guangdong China
Contact Person Ho

Request A Quote

Please check your email address.
Your message must be at least 20 characters.