Guangzhou DongAo Electrical Co., Ltd.
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu

Parkoo Industrial Air Compressor Dehumidifier For Lab Automatic Defrosting

Price Negotiable
Price: negotiable
MOQ: negotiable
Delivery Time: 45days
Brand: PARKOO
Product Description
PARKOO industrial Brand compressor Automatic defrosting dehumidifier for laboratory
 
Product Description






 
 
 

 

1. Functions
 

1)Microcomputer automatically control,LED digital display
2) Efficient automatic defrosting system,low temperature appliance
3) Have fault automatically judgment fuction
4) 1-24 hours timing function, Intelligent control system for easy operation
5) Special humidity 1%RH can be adjusted, humidity setting range 10~98%RH
6) Pipe continue drainage function, water tank full alarm and switch -off automatically
7) The bottom have universal wheel, in all direction, no dead angle, free movement
 


2. Parameters
 

Article No.CF10KT
Article NameIndustrial Dehumidifier
Dehumidify Capacity10L/HOUR
Applying Area(with three meters height)300~350M2
Voltage380V/50Hz
Rated Input Power2650W
Maximum Power3400W
Air Circulation1800M3/H
RefrigerantR22
CompressorMitsubishi , Daikin
G.W.(KG)160KG
Model Dimension763*472*1680mm
Packing Dimension880*620*1730mm
Related Products

Main category

Company Information

Certifications


FAQ

1. Can you customize the product?
Yes, we can customize any products according to customer's requirements.
 
2. Which payment terms are you doing?
L/C, T/T, (100% payment in advance.)
 
3. Which shipment is available?
By sea, by air, by express or as your requirement.
 
4. Are you a factory or trading company?
We are a factory which specialized in produce dehumidifier about 13years.
 
 
5. How long is the warranty period for the product?
We provide 1-year warranty for our products.
 
6. Do you accept OEM or ODM?
Yes, we do. We sincerely welcomed.
 
7. Can I buy 1 or 2 pieces of samples for testing before bulk order?
Yes, we are pleased to send you samples for the quality and performance test.
 
8.What about the delivery date?
If we have free stocks of the item you need, it can be sent within 1 week after receiving deposit or 100% payment into our bank account.If we don't have free stock, the delivery date can be different for different products. Generally speaking, it will take 35 to 45days.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou DongAo Electrical Co., Ltd.
Location No.109,Huanhua Road,Liwan District,Guangzhou City,Guangdong China
Contact Person Ho

Request A Quote

Please check your email address.
Your message must be at least 20 characters.