Single Stage Co2 Nitrogen Gas Pressure High Pressure Regulator g 5/8 CGA320

Price Negotiable
Price: Negotiable
MOQ: 10 - 49 Pieces
Delivery Time: Negotiable
Brand: AFK
Product Description
Product Description
 
R52 series stainless steel pressure regulator, stainless steel diaphragm reducing pressure constructure, Applicable for  Lab, pharmacy and chemistry industry etc. 
 
SPECIFICATIONS FOR R52 pressure regulator 

 

 

Max. inlet pressure  
500,  1500, 3000psig
outlet pressure 
0-15,0-25,0-50,0-100,0-250psig
safety testing pressure 
1.5times max. inlet pressure
applicable temperature
-10 ℉+165℉ (-23℃+74℃)
leakage rate  
foam test 
Cv
0.06

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Main parts of material
body 
316L
bonnet
316L
seat 
PCTFE
spring 
316L
stem  
316L
o-ring
viton
stainer
316L(10um)

 

 

Main Features

1) piston reducing pressure structure.

2) body ports:1/4NPT (F)

3) set stainer inside.

4) using panel mouting or wall mounting 

 

Ordering Information

R52 L B D G G 00 00 P
ltem Body Material Body Hole Inlet Pressure Outlet pressure Pressure gauge Inlet size Outlet size Options
R52 L:316 A D:3000psig G:0~250psig G:MPa gauge 00:1/4"NPT(F) 00:1/4"NPT(F) P:Panel mounting
  B:Brass B E:1500psig 1:0~100psig P:Psig/bar gauge 01:1/4"NPT(M) 01:1/4"NPT(M) R:With relief valve
    D F:500psig K:0~50psig W:No gauge 23:CGA330 10:1/8"OD N:With needle valve
    G   L:0~25psig   24:CGA350 11:1/4" OD D:With diaphragm valve
    J   M:0~15psig   27:CGA580 12:3/8" OD  
    M   Q:30" Hg Vac-30psig   28:CGA660 15:6mm OD  
        S:30" Hg Vac-60psig   30:CGA590 16:8mm OD  
        T:30" Hg Vac-100psig   52:G5/8M-RH(F) 74:M8B1-RH(M)  
        U:30" Hg Vac-200psig   63:W21 8-14RH(F)    
            64:W21 8-14LH(F)    

 

Application field laboratory, etc

 

FAQ

 

Q1. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than


Q2. Do you have any MOQ limit ?
A: Low MOQ 1 pic.

Q3. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days. Airline and sea shipping also optional.

Q4. How to proceed an order ?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Wofly Technology Co., Ltd.
Location Foor 2, 4th Buidling, A Zone, Xinhe Xinxing Industrial 3th Zone, Fuhai Avenue, Baoan, Guangdong, China.
Contact Person Catlin Zeng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.