Chongqing Linde Technology Development Co., Ltd.
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu
Machinery Metal & Metallurgy Machinery Metal Electroplating Machinery

Electroplating Industrial Wastewater Treatment Systems , Waste Water Purification System

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 1-7working days(depand on raw materials stocking)
Brand: Linde
Product Description

Electroplating wastewater treatment equipment Easy Operation

 

 

Background:

The composition of electroplating wastewater is very complicated. Except for cyanide-containing (CN-) wastewater and acid-base wastewater, heavy metal wastewater is a potentially hazardous wastewater category in the electroplating industry. According to the classification of heavy metal elements contained in heavy metal wastewater, it can be generally divided into chromium (Cr) wastewater, nickel (Ni) wastewater, cadmium (Cd) wastewater, copper (Cu) wastewater, zinc (Zn) wastewater, Gold-containing (Au) wastewater, silver-containing (Ag) wastewater, and the like.

 

1) Equipment name: Electroplating wastewater treatment equipment

2) Use occasions: electronics factory, electroplating industry, auto parts manufacturing.

 

3) Flow chart:

 

 

 

4) Process Description: Basically use alkali (caustic or lime), polyaluminum chloride (PAC) and organic flocculant (PAM), the pH value of the integrated water is mentioned as 10~13, the alkali concentration is large and the alkali and heavy metals are forced. The reaction proceeds to form a hydroxide for flocculation precipitation. Subsequent use of chlorine dioxide to strongly oxidize the effluent to remove harmful substances such as heavy metals and cyanide in the water.

 

 

5) Advantages: It is buried below the surface of the earth. The surface above the equipment can be used as greening or other land. It does not need to build houses, heating and heat preservation. Fully automatic electrical control system and equipment fault alarm system, safe and reliable operation. It has excellent properties such as corrosion resistance and aging resistance. Simple construction and easy operation

 

6) Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Chongqing Linde Technology Development Co., Ltd.
Location 1-4, No. 247-97, Mangrove Community, Taoyuan Avenue, Yubei District, Chongqing
Contact Person Xiang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.