Chongqing Linde Technology Development Co., Ltd.
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 1-7working days(depand on raw materials stocking)
Brand: Linde
Product Description

5.14 Sludge Drying Equipment Stacking Machine Plate Frame Machine Centrifuge Screw Press Belt Filter Press

 

Supply (cooperation) method and delivery cycle

STEP1: Determine the usage scenario.

SETP2: Analyze the quality of contaminated water (if necessary, perform laboratory analysis)

STEP3: Determine the treatment process.

4. The supplier forecasts the price duration and governance objectives of the equipment or system.

5 The supply and demand sides negotiate and negotiate the price schedule and the governance objectives, sign the contract and pay the supplier prepayment.

6. After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7. The supplier rushed to the place where the buyer needed to use the installation guidance and commissioning.

8. System training for equipment use and maintenance.

 

1) Equipment name: stacking machine

 

2) Use occasions: Suitable for sludge treatment in municipal sewage, food, beverage, chemical, leather, paper, printing and dyeing, pharmaceutical, winery and other industries

 

3) Equipment picture:

 

 

Equipment diagram:​

 

Process flow chart:​

 

 

Installation site picture:

 

 

 

 

Advantages:

high degree of equipment automation, saving labor; easy to block during operation, low operation and maintenance cost; continuous automatic operation, automatic operation from sludge lifting, dosing, dehydration, transportation; can be unattended, suitable for high risk Explosion-proof working environment; equipment is very compact, small footprint, low infrastructure requirements, saving infrastructure and supporting investment; low equipment failure rate, long service life; large processing capacity, multiple units can be used side by side; ultra low energy consumption, processing costs Low, comprehensive treatment costs are much lower than other sludge dewatering equipment.

 

 

Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Chongqing Linde Technology Development Co., Ltd.
Location 1-4, No. 247-97, Mangrove Community, Taoyuan Avenue, Yubei District, Chongqing
Contact Person Xiang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.