150mm Inner Tube Rubber Extrusion Line Temperature Control System
150mm Inner Tube Rubber Extrusion Line Temperature Control System
USED FOR:
Rubber Extrusion Line is used to extrude rubber semi-finished products like tyre tread ,inner tube ,wires & cables , rubber strips ,capsule etc.
| Spec Item |
GE90KS×14D | GE120KS×14D | GE150KS×16D | GE200KS×18D | GE200KS×18D | GE250KS×14D | ||
| Screw dia | mm | 90 | 120 | 150 | 200 | 200 | 250 | |
| L/D ratio | 14:1 | 14:1 | 16:1 | 18:1 | 12:1 | 12:1 | ||
| Max.screw speed | r/min | 60 | 55 | 44 | 33 | 26 | 22.63 | |
| Hopper | mm | 130×122 | 164×140 | 200×165 | 260×210 | 260×210 | 320×246 | |
| Row qty of pin | 8 | 10 | 10 | 12 | 10 | 10 | ||
| Pin qty.of each row | 6 | 6 | 8 | 10 | 10 | 12 | ||
| Model of motor | Z4-200-21 | Z4-200-31 | Z4-250-21 | Z4-280-32 | Z4-280-11 | Z4-280-32 | ||
| Power | kW | 67 | 90 | 185 | 315 | 250 | 315 | |
| Zone of hot water circulation | 4 | 4 | 4 | 4 | 3 | 4 | ||
| Thermal cycle heating power | kW | 24 | 48 | 48 | 54 | 42 | 48 | |
| Capacity | kg/h | 360 | 800-1000 | 1800-2000 | 2100-2600 | 2300 | 3000 | |
| Overall dimensions | L | mm | 2540 | 3996 | 6000 | 7770 | 6250 | 6885 |
| W | mm | 1493 | 1575 | 2600 | 3000 | 3000 | 2400 | |
| H | mm | 1416 | 1760 | 1800 | 2035 | 2035 | 2090 | |
| About weight | t | ~4.5 | ~6 | ~7.25 | ~16.6 | ~12.6 | ||
Photos
Salient Features
• Scroll & liners are made of EN-41B, Nitra hardened & polished
• Variable speed
• Feed roll devices
• TCU for temperature control with straight, cross or co-extrusion heads
• Feeding arrangement with spiral undercut & feed roll arrangement provided which ensures a proper bite & strip fed to screw
• Automatic temperature controlling system
• Feeding arrangement with spiral undercut and feed roll arrangement provided which ensures a proper bite & strip fed to screw
Services Commitment
1. Our engineers can design target machines for you and send the drawing to confirm.
2. In the process of production, we will take photos and send to customers for you tracking.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas technical support
6.Test Machine Before Delivery, you only need to connect the wires to the outside the control cabinet.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

