EPC Electric Car Assembly Line Project - 300-500kW Power, 50-100 Units/Month Initial Production Capacity
Price:
USD 800,000-300,000,000
MOQ:
1 project
Delivery Time:
240 days
Brand:
BG EV
Product Description
EPC Project Electric Car Assembly Line Solutions
Complete engineering, procurement, and construction services for electric vehicle manufacturing facilities with phased investment approach and technical support.
Partnership Requirements
- Workspace: Minimum 5,000-8,000 sqm workshop with 15,000-25,000 sqm industrial land
- Investment Capacity: Over $2 million USD (excluding land and workshop value)
- Market Channels: Established automotive sales network, garage operations, or related businesses
- Import Policy: Minimum 30-35% tariff differential between CBU and CKD imports
Project Development Strategy
Following China's proven automotive industry development model with staged investment and gradual expansion:
- Initial production line equipment: ~$1 million USD
- Workshop construction: 5,000-8,000 sqm at $70-80 per sqm
- Power requirements: 300-500kW capacity
- Production scaling: Starting at 50-100 units/month, increasing with market demand
- Workforce: Initial 50-100 personnel including technical and management staff
Assembly Line Equipment Specifications
Stamping Line
| Equipment | Quantity | Unit | Remarks |
|---|---|---|---|
| Complete Stamping Line | 1 | Unit | For single body production |
| 1500-ton Press Machine | 1 | Unit | Core forming equipment |
| 1000-ton Press Machine | 2 | Unit | Secondary forming operations |
| 800-ton Press Machine | 3 | Unit | Supporting press functions |
| 600-ton Press Machine | 5 | Unit | Finishing operations |
| Electric Conveying Belt | 70 | Meters | With inspection and handling systems |
Welding Line
| Equipment | Quantity | Unit | Remarks |
|---|---|---|---|
| Pneumatic Welding Jigs | 15 | Set | With hand welding tools and frames |
| Body Welding Fixtures | 5 | Set | Each with 4 robots and handling systems |
| Transporting Tool Cars | 60 | Unit | For body transportation between stations |
| Sheet Metal Repair Machines | 10 | Unit | Body surface preparation |
| Intermediate Frequency Spot Welding Machines | 20 | Set | Integrated with welding robots |
Coating Line
| Equipment | Quantity | Unit | Remarks |
|---|---|---|---|
| Metal Surface Pre-Treatment System | 1 | Set | For vehicles under 8m length |
| Electrophoresis Coating System | 1 | Set | With overhead conveying and chemical systems |
| Body Polishing Room | 1 | Set | 16.4×5×4m dimensions |
| Water Rotating Painting Booth | 1 | Set | 16×4.5×4m for coating applications |
| Robot Painting System | 1 | Set | 4 robot arms with 8 painting nozzles |
| Sealed Curing Chamber | 1 | Set | 140-180°C temperature range |
General Assembly Line
| Equipment | Quantity | Unit | Remarks |
|---|---|---|---|
| Interior Assembly Line 1 | 100 | Meters | For glass, seats, and interior assembly |
| Monocoque Chassis Assembly Line | 100 | Meters | For SUV, van, and saloon car assembly |
| Lifting Machines | 4 | Unit | For chassis handling operations |
| Interior Assembly Line 2 | 100 | Meters | For complete vehicle wiring assembly |
| Tyre Dynamic Balancing Machines | 2 | Unit | Wheel balancing and alignment |
Testing & Quality Control
| Equipment | Quantity | Unit | Remarks |
|---|---|---|---|
| Vehicle Testing Line | 1 | Set | For vehicles up to 10 tons capacity |
| Motor & Circuit Inspection Systems | 1 | Set | Electric vehicle specific testing |
| Auto Fault Diagnostic Machines | 2 | Set | For comprehensive vehicle diagnostics |
| Rain Laboratory | 1 | Set | Water ingress testing facility |
Supporting Infrastructure
| Equipment | Quantity | Unit | Remarks |
|---|---|---|---|
| Compressed Air Supply Systems | 3 | Set | 8m³ capacity with complete distribution |
| Factory Power Systems | 1 | Set | 380V power and 220V lighting |
| Standby Generator Sets | 2 | Set | 250kW capacity for emergency power |
| Exhaust Gas Collection Systems | 3 | Set | For welding, painting, and assembly areas |
Production Phasing
- Phase 1: SKD assembly with pre-treated body components
- Phase 2: CKD assembly with complete welding and coating capabilities
- Phase 3: Localized parts manufacturing and expanded model range
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Chongqing Big Science & Technology Development Co., Ltd.
Location
18F ZHONGXIN BANK BUILDING HONGQIHEGOU CHONGQING CHINA
Contact Person
Wang