NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
                                                                                                           
Verified Supplier
38 Years
Since 1988
Menu

Oiled Welded Steel Tube Carbon Steel / Carbon Manganese Steel Astm A178

Price Negotiable
Price: Negotiation
MOQ: 5 tons
Delivery Time: 45 days
Brand: New Era
Product Description

ASTM A178 Electric-Resistance-Welded Carbon Steel and Carbon-Manganese Steel Boiler and Superheater Steel Tube

Oiled Welded Steel Tube Carbon Steel / Carbon Manganese Steel Astm A178

 

Application:boiler tubes,boiler flues,superheater flues and safe ends.

Size:L--4~12m

OD--12.7-127mm

WT--0.9-9.1mm

Grade:Type A,C and D

Manufacture :electric-resistance welding.

Heat Treatment:After welding,all tubes shall be heat treated at a temperature of 1650°F[900℃]or higher and followed by cooling in air or in the cooling chamber of a controlled-atmosphere furnace.Cold-drawn tubes shall be heat treated after the final cold-draw pass at a temperature of 1200°F[650℃] or higher.

 

TABLE 1 Allowable deviation of outer diameter and wall thickness

Unit: millimeter

Nominal outside diameter D Allowable deviation of outer diameter Permissible deviation of wall thickness
D≤48.3 ±0.50 ±10%S
48.3<D≤273 ±1%D
D>273 ±0.75%D

 

TABLE 2 Mechanical Property

Grade

Tensile strength

 

Lower yield strength

Elongation A%

Not less than

D≤168.3 D>168.3
Type A 375 235 15 20
Type C 390 295 13 18
Type D 470 345 13 18
Note : Tensile test arbitration time is based on longitudinal sample.

 

Surface Quality:The internal and external surfaces of the steel tube are not allowed to have cracks, scabs, folds, delaminations, laps, and burns. Allows for scribes, scratches, misalignment of welds, burns, oxide scales, and external burr removal traces that are not more than a negative wall thickness deviation

 

Inspection items:

chemical composition

Tensile test

Ultrasonic examination

Eddy current flaw detection

Bending test

Flattening test

 

 
FAQ:
1. Can you provide a sample to check the quality?
We can provide free sample with same or similar sizes for you to check tube quality.

You need to in charge of Express costs.
2. How about your production capacity?
3000 tons/Month.

3. What are your terms of payment?
30%TT in advance, Balance to be paid before shipment.

4. Where is your factory?
Jiaxing city, 2 hours away from Shanghai.

5. How can I get the quotation A.S.A.P?
Please send us an inquiry with full details as following,quotation will sent to you A.S.A.P:
1). Tube Standard
2). Steel Grade

3). Tube Size and Size Tolerance
4). Tube length

5). Quantity
6). If any special requirements
6. How about the minimum order quantity?
Normally for one size above 1 ton.

Welcome to contact us! Thanks.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
Location No.101 Shijing East Road, Tudian Town, Tongxiang, China
Contact Person Denny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.