NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
                                                                                                           
Verified Supplier
38 Years
Since 1988
Menu

Boiler / Superheater Welded Steel Pipe Astm A178 Erw Round Shape 0.9 - 9.1mm WT Size

Price Negotiable
Price: Negotiation
MOQ: 5 tons
Delivery Time: 45 days
Brand: New Era
Product Description

ASTM A178 ERW carbon steel and carbon manganese steel boiler and superheater tubes,boiler tube/pipe

Material: Carbon steel and carbon manganese steel
Production: Electric Resistance Welding
Size range: O.D.: 12.7-127mm W.T.:0.9-9.1mm L: according to customer requirement
Applications: For Boilers, Superheaters, Heat-Exchangers, Condensers, Boiler flues, Superheater flues and Safe ends
 
Heat treatment:
After welding, all tubes are heat treated at a temperature of 1650℉ (900℃) or higher and followed by cooling in air or in the cooling chamber of a controlled atmosphere furnace.
Cold-Drawn tubes are heat treated after the final cold-draw pass at a temperature of 1200℉(650℃)or higher.
Tests and Inspection:
Tensile Test
Crush Test
 
Mechanical Test
- Flattening Test
- Flange Test
 
Chemical Properties

ElementGrade A,Low-Cabon SteelGrade C,Medium-Carbon Steel

Grade D,
Carbon-Manganese Steel

Carbon0.06-0.180.35 Max0.27Max
Manganese0.27-0.630.80Max1.00-1.50
Phosphorus,Max0.0350.0350.030
Sulfur,Max0.0350.0350.015
Silicon--0.10 min
Mechanical PropertiesGrade AGrade CGrade D
Tensile Strength:min ksi(Mpa)47(325)60(415)70(485)
Yield Point:min ksi(Mpa)26(180)37(255)40(275)
Elongation≥35%≥30%≥30%

 
Tolerance for OD and WT(SA-450/SA-450M)

OD in(mm)+-WT in(mm)+-
<1''(25.4)0.100.10≤1.1/2''(38.1)20%0
1''~1.1''(25.4~38.1)0.150.15>1.1/2''(38.2)22%0
>1.1/2''~<2''(38.1~50.80.200.20   
2''~<2.1/2''(50.8~63.5)0.250.25   
2.1/2''~<3''(63.5~76.2)0.300.30   
3''~<4''(76.2~101.6)0.380.38   
4''~<7.1/2''(101.6~190.5)0.380.64   
>7.1/2~9''(190.5~228.6)0.381.14  
 

 


 
FAQ:
1. Can you provide a sample to check the quality?
We can provide free sample with same or similar sizes for you to check tube quality.

You need to in charge of Express costs.
2. How about your production capacity?
3000 tons/Month.

3. What are your terms of payment?
30%TT in advance, Balance to be paid before shipment.

4. Where is your factory?
Jiaxing city, 2 hours away from Shanghai.

5. How can I get the quotation A.S.A.P?
Please send us an inquiry with full details as following,quotation will sent to you A.S.A.P:
1). Tube Standard
2). Steel Grade

3). Tube Size and Size Tolerance
4). Tube length

5). Quantity
6). If any special requirements
6. How about the minimum order quantity?
Normally for one size above 1 ton.

Welcome to contact us! Thanks.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
Location No.101 Shijing East Road, Tudian Town, Tongxiang, China
Contact Person Denny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.