NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
                                                                                                           
Verified Supplier
38 Years
Since 1988
Menu

Welded Precision Steel Tube High Precision E275 E355 Fluid / Gas Transport Decoration

Price Negotiable
Price: Negotiation
MOQ: 5 tons
Delivery Time: 40 days
Brand: New Era
Product Description

EN10305-2 E155,E195,E235,E275,E355 Welded Cold Drawn DOM Steel Tubes

 

Steel Grade/Steel Material:

 

E155 E195 E235 E275 E355

 

Delivery Condition:

 

1 BK Cold finished(hard)

2 BKW Cold finished(soft)

3 BKS Cold finished and stress-relieved

4 GBK Annealed

5 NBK Normalized

 

Size Range:

 

O.D.:6-350mm

W.T.:1-35mm

L:max12000mm

 

Characteristic:

 

Good concentricity

Good OD and ID tolerance

High precision

Stable quality

Smooth roughness

 

DOM Steel Tube Production Process:

 

Raw material → Incoming inspection → Cutting → Heating → Piercing → Hammering →Pickling → Cold-drawing → Heat treatment → Physical chemistry test → Straightening → Ends cutting → Final inspection → Bundling →Storage

 

 

Standard

 

DIN2391, EN10305, ASTM A519, GB/T 8713, GB/T3669...

 

Material

 

20# ,45# ,Q345B,Q345D,25Mn,27sIMn,E355/st52, SAE1026...

 

Specification

 

ID OD

 

 

2-30mm 20-350mm

 

I.D Tolerance

 

H8 H9

 

Length

 

3-6m (Customers usually choose the 4~5.8m)

 

Straightness

 

1/1000
Surface

 

polished or coating

 

Delivery time

 

25-45 days

 

Packing

 

Bundled with knitted plastic bag, wooden cases or according to customers' request.

 

application

 

Fluid and gas transport,decoration, construction,medical equipment, aviation,

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
Location No.101 Shijing East Road, Tudian Town, Tongxiang, China
Contact Person Denny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.