NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
                                                                                                           
Verified Supplier
38 Years
Since 1988
Menu

30CrMnSiA Cold Drawn Drill Rod

Price Negotiable
Price: Negotiation
MOQ: 1 tons
Delivery Time: 45 days
Brand: New Era
Product Description

XJY750 30CrMnSiA NQ69.85x60.33mm seamless mining drill pipes cold drawn steel tubing

1. Product Name: Seamless Steel Tubing wire-line drill rods
2. Size Range: AQ,BQ,NQ,HQ,PQ Length:3m,3.06m 5.8m/6m, maximal 11.8m
3. Stable Quality with Comeptitive Price
4. Protective Atmosphere Heat Treatment, Surface is clean and smooth, without oxide scale
5. Good Extending and Bending Ability, Longer Work Life

Product Name Seamless Steel Tubing wire-line drill rods
Material XJY750 30CrMnSiA
Delivery Condition HR, CW, SR, A, N,Quenching & Tempering
Standard ASTM A519 GB9808
Application Wire-line drill rods
Certificate TS16949, ISO 9001
HS code 7304319000
Delivery Time 40 days
Pakcing Bundles or Woodern Boxes
1.International Standard Sizes,Tolerance,Prices          
Specification OD mm OD tol. Mm ID mm ID tol. Mm Wt.mm Length, mm Steel Class FOB Shanghai
usd/ton
BQ 55.55 +0.25 46.20 -0.25 4.8 3060/3050/3000 4130+SR  
NQ 68.85 +0.25 60.32 -0.25 4.9 3060/3050/3000 4130+SR  
HQ 88.90 +0.38 78.00 -0.38 5.6 3060/3050/3000 4130+SR  
PQ 114.30 +0.38 103.17 -0.38 6.3 3060/3050/3000 4130+SR  
                 
2.Different Steel Claess and Techanical data:          
Steel Name Steel class Tensile Strength
Min.MPA
Yield Strength Min.MPA Elongation
Min %
Hardness HRC Heat-treatment
Condition
Residual hoop
stress Max.MPA
Grain Size
Min class
45MnMoB XJY600 790 600 14 21-25 +N / 8
30CrMnSiA XJY750 850 750 15 26-31 Q+T / 8
42CrMo XJY850 950 850 15 28-33 Q+T / 8
straightness of tubes Class 1: Max 1/2000mm; Class 2: 1/6000mm
straightness at ends Not more than 0,25 mm per 0.2 meter of length from each of the end of pipe
Surface Black smooth surface or black phosphated
Packing anti-rusty oil protected,bundles wrapped with Plastic bags
Delivery time 20-30days

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
Location No.101 Shijing East Road, Tudian Town, Tongxiang, China
Contact Person Denny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.