NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
                                                                                                           
Verified Supplier
38 Years
Since 1988
Menu

CDS Cold Drawn Seamless Steel Pipe

Price Negotiable
Price: Negotiation
MOQ: 1 tons
Delivery Time: 45 days
Brand: New Era
Product Description

CDS Cold Drawn Seamless Steel Pipe

Outer diameter: 6mm -88mm

Wall thickness: 1-15mm

Material: St35, St45, St52, E235, E255, E355, 10#, 20#, Q345B, 16Mn. SAE1010, SAE1020


Material & Chemical Composition

Material Name St35 St45 St52
chemical analysis C: ≤0.17;Si: ≤0.35;Mn: ≥0.40;P: ≤0.025; S: ≤0.025; C: ≤0.21;Si: ≤0.35;Mn: ≥0.40;P: ≤0.025; S: ≤0.025 C:≤0.22;Si: ≤0.55;Mn: ≤1.60;P: ≤0.025; S: ≤0.025
Tensile Strength BK, ≥480MPa; BKW, ≥420MPa;BKS, ≥420MPa;GBK, ≥315MPa;NBK,340-470MPa BK, ≥580MPa; BKW, ≥520MPa;BKS, ≥520MPa,GBK, ≥390MPa, NBK 440-570MPa BK, ≥640MPa; BKW, ≥580MPa;BKS, ≥580MPa;GBK, ≥490MPa;NBK,490-630MPa
Yield strength BKS, ≥315MPa; NBK, ≥235MPa

BKS,≥ 375MPa;

NBK≥255MPa

BKS, ≥420MPa; NBK, ≥355MPa
Standard DIN2391
Length 5-5.8M, 5.8M fixed length, or as customer's request
Packaging Bundles Package, wooden box
Heat Treatment/ Delivery Condition

1.Cold finished (hard) BK(+C)

Tubes do not undergo heat treatment following the final cold forming and, thus, have a rather high resistance to deformation

2.Cold finished (soft) BKW(+LC)

The final heat treatment is followed by cold drawing involving limited deformation. Appropriate further processing allows a certain degree of cold forming (e.g. bending, expanding)

3.Cold finished and stress-relieved annealing BKS(+SR)

Heat treatment is applied following the last cold forming process. Subject to appropriate processing conditions, the increase in the residual stresses involved enables both forming and machining to a certain degree.

4.Annealed GBK(+A)

The last Cold forming process is followed by annealing in a controlled atmosphere.

5.Normalized NBK(+N)

The last cold forming process is followed by annealing above the upper transformation point in a controlled atmosphere.

Delivery Time 45 days
Payment Term 30% TT in advance, Balance to be paid before shipment
Usage/Application Truck drag link, automotive parts
Surface free of oxide scale, bright

 

 
Tags: Cold drawn steel pipe, steel pipe, precision steel pipe, Seamless steel pipe

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
Location No.101 Shijing East Road, Tudian Town, Tongxiang, China
Contact Person Denny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.