NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
                                                                                                           
Verified Supplier
38 Years
Since 1988
Menu

127MM OD ASTM A178 Gr.A Seamless Boiler Tube

Price Negotiable
Price: Negotiation
MOQ: 1 tons
Delivery Time: 45 days
Brand: New Era
Product Description

ASME SA-178/SA-178M ELECTRIC-RESISTANCE WELDED CARBON STEEL PIPES

Seamless STEEL BOILER TUBES/SUPERHEATER TUBES/ERW STEEL PIPES

ASME A178/A178M ELECTRIC-RESISTANCE WELDED BOILER TUBES/ERW ROUND BOILER TUBING/BENDING TUBES

1.This specification covers minimum-wallthickness,electric-resistance-welded tubes made of carbon

steel and carbon-manganese steel intended for use as boiler tubes, boiler flues, superheater flues, and
safe ends.

2.The tubing sizes and thicknesses usually furnished to this specification are 1⁄2 to 5 in. [12.7 to 127 mm]
in outside diameter and 0.035 to 0.320 in. [0.9 to 9.1mm], inclusive, in minimum wall thickness. Tubing
having other dimensions may be furnished, providedsuch tubes comply with all other requirements of this
specification.

3.Reference ASTM Standards:

A 226/A 226M Specification for Electric-Resistance-Welded Carbon Steel Boiler and Superheater Tubes
for High-Pressure Service
A 450/A 450M Specification for General Requirementsfor Carbon, Ferritic Alloy, and Austenitic Alloy Steel
Tubes
A 520 Specification for Supplementary Requirements for Seamless and Electric-Resistance-Welded Carbon
Steel Tubular Products for High-Temperature Service Conforming to ISO Recommendations for Boiler Construction.
E 213 Practice for Ultrasonic Examination of Metal Pipe and Tubing
E 273 Practice for Ultrasonic Examination of Longitudinal Welded Pipe and Tubing

A 450/A450M Test report required (Certification Section of Specification A 450/A 450M)

4.The steel for Grade D shall be killed.
5.Tubes shall be made by electric-resistance welding tubes/ERW tubing

6.The ERW metal tubes including steel grade A.C,D

7.After welding, all tubes shall be heat treated at a temperature of 1650°F [900°C] or higher and followed
by cooling in air or in the cooling chamber of a controlled-atmosphere furnace. Cold-drawn tubes shall
be heat treated after the final cold-draw pass at a temperature of 1200° [650°C] or higher.

8.Steel round tubing/ERW tubes Including Grade(A.C.D) Chemical Requirements:

 

Element

of Steel tubes

Grade A
low-Carbon Steel
Grade C
Medium-Carbon Steel
Grade D
Carbon-Manganese Steel
Carbon
0.06-0.18
0.035 max
0.27 max
Manganese
0.27-0.63
0.80 max
1.00-1.50
Phosphorus, max
0.035
0.035
0.030
Sulfur, max
0.035
0.035
0.015
Silicon
...
...
0.10 min

 

9.The Steel tubing Tensile Requirements:
 
Grade C
Grade D
Tensile Strength, min, ksi [MPa]
60 [415]
70 [485]
Yield Strength, min, ksi [MPa]
37 [255]
40 [275]
Elongation in 2 in. or 50mm, min, %
30
30
 
11.The ERW round tubes/tubing with U-Bending tubes pictures :


 

Tags:SA178 welded Steel tubes,SA178 welded Steel pipes;A178 steel pipes;Welded tubing;

U-pipes,U-bending pipes,Bending pipes

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
Location No.101 Shijing East Road, Tudian Town, Tongxiang, China
Contact Person Denny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.