NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
                                                                                                           
Verified Supplier
38 Years
Since 1988
Menu

290MPa STKM11A Seamless Cold Drawn Steel Pipe JIS G3445

Price Negotiable
Price: Negotiation
MOQ: 1000kg
Delivery Time: 30days
Brand: NEW-ERA
Product Description

Seamless Cold Drawn Steel Pipe JIS G3445

JIS G3445 STKM11A STKM12A STKM13A STKM13C Cold Drawn Steel Pipe

 

PRODUCT DESCRIPTION
Seamless Steel Pipes
JIS G3445
Steel Grade:STKM11A STKM12A STKM13A STKM13C STKM14B

 

Product Name STKM11A steel pipe STKM12A steel pipe STKM13A steel pipe STKM13C steel pipe STKM14B steel pipe
chemical analysis C:≤0.12;Si:≤0.35;Mn:≤0.60;P:≤0.040; S:≤0.040 C:≤0.20;Si:≤0.35;Mn:≤0.60;P:≤0.040; S:≤0.040 C:≤0.25;Si:≤0.35;Mn:0.30-0.90;P:0.040;S:0.040 C:≤0.25;Si:≤0.35;Mn:0.30-0.90;P:≤0.040;S:≤0.040 C:≤0.30;Si:≤0.35; Mn:≤0.30-1.00;P:≤0.040; S:≤0.040
Tensile Strength ≥290MPa ≥340MPa ≥370MPa ≥510MPa ≥500MPa
Yield strength - ≥175MPa ≥215MPa ≥380MPa ≥355MPa
Standard JIS G3445
Length As customer's request
Packaging Standard export packing, packed in woven bags, with two nylon slings, or can be customized as request
Heat Treatment/ Delivery Condition
  1. Cold finished (hard) BK(+C)
Tubes do not undergo heat treatment following the final cold forming and, thus, have a rather high resistance to deformation
  1. Cold finished (soft) BKW(+LC)
The final heat treatment is followed by cold drawing involving limited deformation. Appropriate further processing allows a certain degree of cold forming (e.g. bending, expanding)
  1. Cold finished and stress-relieved annealing BKS(+SR)
Heat treatment is applied following the last cold forming process. Subject to appropriate processing conditions, the increase in the residual stresses involved enables both forming and machining to a certain degree.
  1. Annealed GBK(+A)
The last Cold forming process is followed by annealing in a controlled atmosphere.
  1. Normalized NBK(+N)
The last cold forming process is followed by annealing above the upper transformation point in a controlled atmosphere.
Delivery Time Within 35-50 days from receiving deposit
Payment Term 100% L/C at sight or 30% deposit, 70% balance against copy of B/L
Usage/Application Pipes for automobile and motorcycle
Main Market Asia, Middle East, Europe, etc.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
Location No.101 Shijing East Road, Tudian Town, Tongxiang, China
Contact Person Denny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.